HomeMy WebLinkAbout2005-008 - 3955 69th Ave FULL PACKETCity of Brooklyn Center
Planning Commission Application
Date Received
Please Print Clearly or lype
Address/Street Location of Property 7�`
Legal Description of Property LC
It- TI c;T- -Y
.0 i< V—
Owner
Address
Application No.
WIM
l/ n e r,)i-- eL""� c✓
Phone No.
Applicant Phone No. (-11
Address t E � j
TAyXt %3- SSD Tr
Type of Request: Rezoning Variance Special Use Permit
® Subdivision Approval F1 Site & Building Plan Approval
Other:
of Request:
Application Fee $ Acct No. 10100-4403 Receipt No. y S
The applicant requests processing of this application and agrees to pay to the City of Brooklyn Center,
within fifteen (15) days after mailing or delivery of the billing statement, the actual costs incurred by the
City for Engineering, Planning and Legal expenses reasonably and necessarily required by the City for the
processing of the application. Such costs will be in addition to the application fee described herein.
Withdrawal of the application will not relieve the applicant of the obligation to pay costs incurred prior to
withdrawal.
Applicant (Please Print) Applicant's ignature
PLANNING COMMISSION RECOMMENDATION
Dates of P. C. Consideration:
5
Approved Denied this 9 day of 20 C% S , subject to the
following conditions:
.
-------------------------------------------------------------------------
CITV C[)UNC11 ACTION
Dates of Council Consideration: 3 '�`
Approved Denied • this day of fi'i6CL1 20 1 , with the following
CITY OF BROOKLYN CENTER
6301 Shingle Creek Parkway
Brooklyn Center, MN 55430
PROCEDURES AND REQUIREMENTS FOR FILING APPLICATION FOR
SITE AND BUILDING PLAN APPROVAL
Prior to submission of an application for plan review and approval, prospective applicants should arrange an
informational meeting with the Planning Staff to discuss preliminary plans and to become familiarized with
applicable ordinance and policy provisions.
Four (4) copies of the following documents and information will be submitted, nt least 14 dais prior to the date
of the regular Commission meeting, concurrent with filing the application (required documents must be
consistent with ordinance and policy provisions before an application may be accepted):
1. A certified site survey drawing by a registered engineer or land surveyor showing pertinent existing
condition, accurately dimensioned.
2. *An accurately scaled and dimensioned site plan indicating:
a) parking layouts and access provisions, including calculation of ordinance parking requirements;
b) designations and locations of all proposed buildings and required setback lines;
c) fences, walls or other screening, including heights and type of material;
d) outside lighting provisions, type and location (foot candle strength at property line must be calculated);
e) curbing (13612 curb and gutter is required). Indicate radius measurements;
f) building information, including: gross floor area, type of construction and occupancy classification.
3. *A landscape plan showing areas to be sodded or seeded, quantity, location, size and species of trees and
shrubbery. (Note: Underground irrigation is required in all landscaped areas in commercial and industrial
districts. Plans must be so noted.)
4. *Building floor plans, elevations, sections and specifications, including materials proposed.
5. *Existing and proposed land elevations, drainage provisions, and utility provisions, including the diameters
of utility lines.
6. Additional drawings, plans or information deemed necessary by the Secretary.
*Must be prepared by a registered architect or person registered with the State Board of Registration for
Architects, Engineers, Landscape Architects and Land Surveyors, and said drawings./plans will be so
certified.
NOTE: Upon approval of plans by the Council and prior to issuance of permits, a Performance Agreement as to
approved site improvements and a supporting financial guarantee, in an amount to be determined by
the City, are required. Acceptable financial instruments include cash escrow; certificate of deposit;
and performance bond.
Copies of the Zoning Ordinance may be obtained from the Administrative Office. Questions should be directed
to the Planning and Zoning Specialist at 763-569-3330.
Procedures & Requirements for Filing
Application for Site & Bldg Plan Approval
Revised 3-01
Application Filed on 4-07-05
City Council Action Should Be
Taken By 6-06-05 (60 Days)
Planning Commission Information Sheet
Application No. 2005-008
Applicant: CBR Development, LLC
Location: 3955 69th Avenue North
Request: Preliminary Plat
The applicant, Thomas Rollings on behalf of CBR Development, LLC, is seeking preliminary
plat approval to divide the lot located at 3955 69th Avenue North into eight lots and an outlot for
development of an eight unit, potentially owner occupied, townhouse complex. Planning
Commission Application No. 2005-009 is a companion application requesting site and building
plan approval for this eight unit townhouse complex.
The property in question is zoned R-3 (Multiple Family Residence — Townhouse/Garden
Apartments) and is located on the south side of 69th Avenue North on the lot immediately west of
the city water tower. It is surrounded on the east, south and west by other R-3 zoned property
containing the city water tower (east), the Victoria Townhomes (south), and a non -conforming
single family home (west). To the north is 69th Avenue North with a large landscape median
dividing the east and west bound lanes with R-1 zoned property on the opposite side of the street.
Townhouses such as those being proposed for development are permitted uses in this R-3 zone.
The existing lot is a metes and bounds description of a portion of Lot 3, Auditor's Subdivision
No. 25. This description includes a portion of the 69th Avenue North right of way (33 ft.) that
will be formerly dedicated with the new plat. The resulting land area of the plat, minus the right
of way, will be approximately 38,598 sq. ft. or .89 acre. The proposed plat will create eight lots
in two blocks (Lots 1-4, Block 1 and Lots 1-4, Block 2) and Outlot A (the common area). Each
of the owners of the individual lots will own an equal interest in the common area, which will be
controlled by the homeowner's association documents, which will be filed as a Declaration of
Covenants and Restrictions with the final plat. These documents should be reviewed and
approved by the City Attorney prior to final plat approval.
The eight townhouse lots to be created will be in two groups of four. The corner lots in the two
blocks are 40 ft. by 44 ft. while the interior lots are 35 ft. by 44 ft. A 26 ft. wide drainage and
utility easement, where utilities serving the units will be located, runs between Blocks 1 and 2.
This will also serve as the drive lane for the two 4-unit buildings. The property lines will
separate the units along the common walls.
Based on the applicant's proposal, a new drive way opening on 69th Avenue North at the center
of the site will need to be constructed while the existing drive way will be abandoned.
4-28-05
Page 1
The density requirement for an R-3 use is 5,400 sq. ft. of land per dwelling unit, or
approximately eight units per acre. The applicant will be seeking a density credit per Section 35-
400, Subdivision lb of the zoning ordinance which allows the total square footage to be reduced
by 500 sq. ft. for each required parking space located under the building. This is a part of the
consideration of Application No. 2005-009. The final plat can only be approved in the manner
submitted if the density credit is granted under the above mentioned application.
The Director of Public Work's/City Engineer is reviewing the preliminary plat as well as the
drainage, grading and utility plans and will offer written comments for the Planning
Commission's consideration. The size of the site is below the threshold for requiring Watershed
Management Commission review.
The Public Work's Director and I have reached the conclusion that we can only recommend
approval of the preliminary plat and the accompanying site and building plan if a new access
arrangement is provided. This would require the City Council to authorize a shared access drive
along the south side of the water tower site to France Avenue North. This access would serve as
access to the subject site as well as access to the other R-3 zoned properties to the west. This
access drive would not be a public street or alley but would serve as a private drive for these
properties. The cost of developing the access drive would be borne by the developer. The Public
Work's Director also believes that utilities serving the sites should be in this area connecting to
existing utilities in France Avenue North. No access to the site or adjacent R-3 sites would be
gained from 69th Avenue North.
Potentially four or five similar complexes as proposed under this application could be developed,
each of which could have access to 69th Avenue. U-turns would be common on 69th Avenue
North at France and at Halifax that would create unacceptable traffic hazards and safety
concerns. Prohibiting access to these developments directly from 69th, forcing access to France,
would be a much more desirable situation. We have encouraged consolidation of lots for
townhouse development but apparently this is not feasible at this time and the developer wishes
to exercise his right to develop the property separately.
A public hearing has been scheduled and notices have been sent.
RECOMMENDATION
This Preliminary Plat approval should be subject to at least the following conditions:
1. The final plat is subject to review and approval by the City Engineer.
2. The final plat is subject to the provisions of Chapter 15 of the city ordinances.
3. Final plat approval is subject to the approval of Planning Commission Application
No. 2005-009 granting density credits per Section 35-400, Subdivision lb to allow
eight dwelling units within this plat.
4-28-05
Page 2
4. A Declaration of Covenants and Restrictions along with homeowner's association
documents shall be reviewed and approved by the City Attorney prior to final plat
approval.
5. Final Plat approval is contingent on access arrangements and agreements allowing
access from the site to France Avenue North and authorizing access through this site
to the properties to the west.
4-28-05
Page 3
City of Brooklyn Center
A Millennium Community
MEMORANDUM
DATE: April 25, 2005
TO: Ron Warren, Planning and Zoning Specialist
FROM: Todd Blomstrom, Director of Public Works�7
SUBJECT: CBR Development — 3955 69th Avenue North
Preliminary Plat and Site Plan Review
Planning Commission Application 2005-008 and 2005-009
Public Works Department staff reviewed the following preliminary documents submitted for
review under Planning Commission Application 2005-008 and 2005-009 for property located at
3955 69th Avenue North.
• Certificate of Survey & Topographic Survey dated March 1, 2005
• Preliminary Plat dated April 8, 2005
• Preliminary Utility Plan dated April 8, 2005
• Preliminary Site and Storm Plan dated April 8, 2005
• Preliminary Grading Plan dated April 8, 2005
The following comments and recommendations regarding the proposed preliminary plat and site
plans are provided for your consideration.
Preliminary Plat
1. The northern 33.07 feet of the plat area shall be dedicated to the public as street right-of-
way for 69th Avenue North.
2. Public drainage and utility easement shall be dedicated over the entire portion of
Outlot A.
3. The applicant will be required to enter into a Subdivision Agreement and an Agreement
for Maintenance and Inspection of Utility and Storm Drainage Systems with the City to
provide for the construction and operation of shared utility infrastructure.
4. All right of way and easements necessary to provide street and utility service to the
proposed site development or accommodate proposed relocation of existing public
utilities within the site shall be dedicated to the public for public use with the final plat.
6301 Shingle Creek Parkway Recreation and Community Center Phone & TDD Number
Brooklyn Center, MN 55430-2199 (763) 569-3400
City Hall & TDD Number (763) 569-3300 FAX (763) 569-3434
FAX (763) 569-3494
www.cityofbrooklyncenter.org
5. The Developer shall coordinate site development plans with Xcel Energy, Centerpoint
Energy, Quest Communications and other private utility companies.
Site Access and Traffic Issues
Traffic access to the proposed development site is limited to a right -in and right -out access
condition to eastbound 69th Avenue. The proposed development has the potential for generating
a high number of U-turn movements at the intersection of France Avenue and 691h Avenue as
well as the intersection of Halifax Avenue and 69th Avenue. The existing median at the
intersection of Halifax Avenue and 69th Avenue is not configured to safely allow U-turn
movements. Vehicle attempting to make a U-turn at Halifax Avenue currently block a
westbound drive lane for 69th Avenue North.
Based on these access issues, engineering staff recommends that the site plan be modified to
include one of the following two options to address the limited access issue.
Provide site access from France Avenue through the southern portion of the adjacent
water tower site and close the existing driveway access onto 69th Avenue North. This
option would require the developer to acquire an access easement from the City to
construct the private driveway across the water tower site. Staff further recommends that
the developer enter into an agreement to allow future development to the west of the site
to use the proposed driveway access across the southern portion of the property to access
France Avenue.
2. Construct a left turn lane along westbound 69th Avenue approaching the intersection of
Halifax Avenue at the developer's expense. This is the least desirable of the two options
because it would not reduce the frequency of U-turn movements along 69th Avenue.
Water Supply and Sanitary Sewer Service
Water and sanitary sewer service is currently available along France Avenue south of 69th
Avenue to serve the proposed development. The existing public sewer and water systems can
provide adequate service for the proposed land use.
1. The utility plan shall be revised to include a note indicating that water and sewer services
for the existing home within the plat must be disconnected at the mains prior to building
demolition. Service disconnections shall be done in conformance with sewer and water
service disconnection specifications available at the city engineering division office.
2. The water meter must be removed from the existing structure prior to building
demolition.
3. The Utility Plan shall be amended to show connections to the public water and sanitary
sewer system from France Avenue.
4. It is recommended that the applicant review the need for 8" diameter water main within
the site to determine if 6" diameter main would be sufficient.
5. Utility service extensions must meet City of Brooklyn Center design standards. The
location and method of connection to existing water and sanitary sewer services shall be
subject to approval by the Supervisor of Public Utilities.
6. The proposed site plan shall be subject to the approval of the City Fire Chief and
Building Official, including hydrant spacing requirements and any other requirements of
the Fire Department.
Storm Drainage
The site plan submittal is incomplete with respect to addressing storm water management
requirements for site development. The proposed site improvement would convert a substantial
portion of the site to impervious surface. NPDES regulations require that land development
projects incorporate construction and post -construction storm water best management practices
to control the rate and quality of storm water discharges.
The preliminary site plan documents did not include storm water design calculations or
other supporting drainage information. The applicant shall provide a site storm water
management plan, including drainage calculations and detailed design drawings for
proposed storm water management facilities, to the Engineering Division for review prior
to submitting the final plat for approval.
2. Post -construction storm water best management practices shall be incorporated into the
site plan to adequately address all storm water management requirements as established
by the Shingle Creek Watershed Management Commission. These standards can be
found at: http://www.shinglecreek.org/appendixb.pdf.
Erosion control measures shall be installed prior to starting site grading operations. The
owner will be responsible for the prompt removal of all dirt and mud tracked onto public
streets from the site during construction.
4. An NPDES construction site erosion control permit must be obtained from the Minnesota
Pollution Control Agency prior to disturbing the site.
The above comments are provided based on the information provided by the applicant at the time
of this review. Subsequent approval of the final site plans may require additional modifications
based on engineering requirements associated with final design of water supply, storm drainage,
sanitary sewer, gas and electric service and final grading as established by the city engineer and
other public officials having jurisdiction over approval and recording of the final plat.
C--
�
�
|
\ CL
,
�
� . !
t;i \
!!!!!
/! ji;.-----s—
,--
- /
3 v \� V8 - —
~�~ ®\� �----------ƒ _
6
a
&
04
cm
■�\
TTO
SSOCIATES
ENGINEERS & LAND SURVEYORS, INC.
STORMWATER MANAGEMENT NARRATIVE
CBR DEVELOPMENT
BROOKLYN CENTER, MINNESOTA
Otto Project No. 2-05-0062
April 6, 2005
Two rain gardens, one located in the northeast portion of the site, the other in the
southeast, will be utilized to reduce the peak discharge from storm events. The
rain gardens will be designed to promote infiltration thereby removing pollutants
and reducing run off volume. The design will include evaluating the on -site soil
characteristics. The on -site soils may require augmentation to provide adequate
infiltration.
A curb cut will be constructed in the east curb line north of Block 2. Run off from
the fronts of the buildings and drive areas will be routed through the curb cut into
the north rain garden. Run off from the rear of the Block 2 Building will be routed
to both the north and south rain gardens. Storm sewer and draintile will be
installed to provide outlets to the rain gardens for storm events which exceed the
design frequency or when the ground is frozen and run off is not infiltrating. In
addition, a catch basin will be installed at the driveway entrance on 69th Avenue
North. This catch basin will pick up the run off from snow melt when snow banks
block the curb cut.