Loading...
HomeMy WebLinkAboutPC81040 - 6/11/81 - Shingle Creek Parkway4 PLANNING COMMISSION FILE CHECKLIST File Purge Date: FILE INFORMATION Planning Commission Application Number: ::;s1C\1+ib PROPERTY INFORMATION Zoning: h PLAN REFERENCE Note: If a plan was found in the file during the purge process, it was pulled for consolidation of all plans. Identified below are the types of plans, if any, that were consolidated. • Site Plans • Building Plans • Other: FILE REFERENCE Note: The following documents were purged when this project file became inactive. We have recorded the information necessary to retrieve the documents. Document Type Date Range Location Agendas: Planning Commission Office Minutes: Planning Commission U'� k k'w City Vault Minutes: City Council �'a,�,`q� ` City Vault Document Type Number Location Resolutions: Planning Commission City Vault Resolutions: City Council City Vault Ordinances: City Council City Vault CITY OF BROOKLYN CENTER PLANNING COMMISSION ZONING APPLICATION Application No. Please Print Clearly or Tyke Street Location of Property Shingle Creek Parkway 81040 Legal Description of Property Lots 1-4, Block 6; Lots 1-4, Block 7, Lots 1-4, Block 8 of Earle Brown Farm Estates. Owner DeVries Builders, Inc. (John DeVries) Address 7564 Mariner Drive - Maple Grove Phone No. 425-7683_ Applicant same Address Phone No. Type of Request: Rezoning Description of Request: Variance X Subdivision AgpLr,(Ky k Amendment Site & Bldg. Plan Approval Special Use Permit Other: Subdivision Amendment. 12 lots. Fee $ 37.00 Receipt No. 55914 App May 28, 1981 ` scant s Signature Date PLANNING COMMISSION RECOMMENDATION Dates of P.C. Consideration: Approved Denied this --�-�- day of ! ` 19 , / , subject to the follow- ing condotons; r��1 M Chairman ------------------------------------------------ CITY COUNCIL ACTION Dates of Council Consideration: Approved Denied this day of 19 T1 , with the following amendment: er P/I Form No. 18 (over please) CITY OF BROOKLYN CENTER, MINNESOTA 6301 Shingle Creek Parkway 55430 PROCEDURES AND REQUIREMENTS FOR FILING APPLICATION FOR SITE AND BUILDING PLAN APPROVAL Prior to submission of an application for plan review and approval, prospective applicants should arrange an informational meeting with the Planning staff to discuss preliminary plans and to become familiarized with applicable ordinance and policy provisions. Three (3) copies of the following documents and information shall be submitted, at least 14 da s prior to the date of the regular Commission meeting, concurrent with filing the application required documents must be consistent with ordinance and policy provisions before an application may be accepted): 1. A certified site survey drawing by a registered engineer or land surveyor showing pertinent existing condition, accurately dimensioned. 2.* An accurately scaled and dimensioned site plan indicating: a) parking layouts including access provisions; b) designations and locations of accessory buildings; c) fences, walls or other screening, including heights and type of material; d) outside lighting provisions, type and location; e) curbing, 3.* A landscape plan showing areas to be sodded or seeded; location, size and species of trees and shrubbery. 4.* Building floor plans, elevations, sections and specifications, including materials proposed. 5.* Existing and proposed land elevations, drainage provisions, and utility provisions. 6. Additional drawings, plans or information deemed necessary by the Secretary. *Must be prepared by a registered architect or person registered with the State Board of Registration for Architects, Engineers and Land Surveyors, and said drawings/plans shall be so certified. NOTE: Upon approval of plans by the Council and prior to issuance of permits, a Performance Agreement as to approved site improvements and a supporting financial guarantee, in an amount to be determined by the City, are required. Acceptable financial instruments include cash escrow; certificate of deposit; and performance bond. Copies of the Zoning Ordinance may be obtained from the Administrative Office. Questions should be directed to the Department of Planning and Inspection. P/I Form No. 19 Planning Commission Information Sheet Application No. 81040 Applicant: DeVries Builders Location: Shingle Creek Parkway Request: Preliminary Plat and Freeway Blvd., extended The applicant requests preliminary plat approval for phases 1 and 2 combined of the Earle Brown Farm Estates. The Earle Brown Farm Estates are located north of I-94, east of "O1d'Xerxes, south of Shingle Creek Parkway, and west of extension of Freeway Boulevard and Xerxes Avenue North. The plat consists of 8 blocks, blocks 1, 2, 3, 4, 6, 7, and 8 consisting of in- dividual townhouse lots and block 5 as the common area including private streets and green areas. Block 1 is a single lot for a service/office development at the corner of Shingle Creek Parkway and Xerxes Avenue North. There are a total of 26 individual townhouse lots in the proposed preliminary plat for Phases 1 and 2. The plat also sets up Outlots A, B, C, and D for future phases 3, 4, 5, and 6 of the Earle Brown Farm Estates. The plat dedicates 60' of right-of-way for the extension of Freeway Boulevard from Xerxes Avenue North west and northerly to Shingle Creek Parkway. Additional land is also to be dedicated for the rerouting of Shingle Creek Parkway. A public sidewalk easement and a public watermain easement are designated through Outlots C and A, the watermain also covering a small area in Outlot D (Phase 6). A sanitary sewer easement traverses the northern portion of the plat between blocks 3 and 2 of Phase 1. One change which might be made to the proposed plat would be the extension of the individual townhouse lots to the point where private driveways meet private road- ways. At present, the individual lots end approximately 5' beyond the garages. This would technically make each unit's driveway only partially private. Since the bulk of driveway space would be left in Block 5, the common area, other residents or their guests might be considered to have a legal sight to use in- dividual driveway spaces. Aside from this change, the plat seems to be in order and approval is recommended, subject to at least the following conditions: 1. The final plat is subject to approval by the City Engineer. 2. The final plat is subject to the provisions of Chapter 15 of the City Ordinances. 3. Homeowners Association documents for all phases of the development are subject to approval by the City Attorney prior to final plat approval of each phase. 4. The preliminary plat shall be revised so that each townhouse lot extends to the point where driveways meet the private roadways within the development. 6-11-81