Loading...
HomeMy WebLinkAboutPC81060 - 8/27/81 - 67th Ln North1**.1 '*.1 PLANNING COMMISSION FILE CHECKLIST File Purge Date: 0 2/1 3 l q6 FILE INFORMATION Planning Commission Application No. PROPERTY INFORMATION Zoning: PLAN REFERENCE Note: If a plan was found in the file during the purge process, it was pulled for consolidation of all plans. Identified below are the types of plans, if any, that were consolidated. • Site Plans • Building Plans • Other: FILE REFERENCE Note: The following documents were purged when this project file became inactive. We have recorded the information necessary to retrieve the documents. Document Type Date Range Location Agenda Cover Sheet: Planning Commission Agenda Book Minutes: Planning Commission Minutes: City Council Resolutions: Planning Commission Resolutions: City Council Ordinances: City Council S/27/8► City Vault -1/14/81, `/12/Bs City Vault City Vault City Vault City Vault Historical Photographs: Planning Commission City Archieve CITY OF BROOKLYN CENTER PLANNING COMMISSION APPLICATION Application No. 81060 Street Location of Property. Please Print Clearly or Type 67th Lane North Legal Description of Property Earle Brown Farm Estates Second Addition Owner DeVries Builders, Inc. Address 7564 Mariner Drive Maple Grove 55369 Phone No. 561-0073 Applicant same Address Phone No. Type of Request: Rezoning Variance Special Use Permit Subdivision Approval X Site & Bldg. Plan Approval Other: Description of Request: Build townhouses in Earle Brown Farm Estates Second Addition. The applicant requests processing of this application and agrees to pay to the City of Brooklyn Center, within fifteen (15) days after mailing or delivery of the billing state- ment, the actual costs incurred by the City for Engineering, Planning and Legal expenses reasonably and necessarily required by the City for the processing of the application. Such costs shall be in addition to the application fee described herein. Withdrawal of the application shall not relieve the applicant of the obligation to p osts/.ncurred prior to withdrawal. , /% ,� / // Fee $ 100.00 Applicant's Signature Receipt No. 56470 Date: August 1.1, 1gR1 PLANNING COMMISSION RECOMMENDATION Dates of P.C. Consideration: Approved Denied this__day of r'ei , following conditions: CITY COUNCIL ACTION Dates of Council Consideration: Approved Denied this day of -� amendment: 19 subject to the man 19with the following Clerk P/I Form No. 18 (over please) k ' CITY OF BROOKLYN CENTER, MINNESOTA 6301 Shingle Creek Parkway 55430 PROCEDURES AND REQUIREMENTS FOR FILING APPLICATION FOR SITE AND BUILDING PLAN APPROVAL Prior to submission of an application for plan review and approval, prospective applicants should arrange an informational meeting with the Planning Staff to discuss preliminary plans and to become familiarized with applicable ordinance and policy provisions. Three (3) copies of the.following documents and information shall be submitted, at least 14 days prior to the date of the regular -commission meeting, concurrent with filing the application (required documents must be consistent with ordi- nance and policy provisions before an application may be accepted): 1. A certified site survey drawing by a registered engineer or land surveyor showing pertinent existing condition, accurately dimensioned. 2.* An accurately scaled and dimensioned site plan indicating: - a) parking layouts including access provisions; b) designations and locations of accessory buildings; c) fences, walls or other screening, including heights and type of material; d) outside lighting provisions,.type and -location; - e) curbing. 3.* A landscape plan showing areas to be sodded or seeded; location, size and species of trees and shrubbery. 4.* Building floor plans, elevations, sections and specifications, including materials proposed. 5.* Existing and proposed land elevations, drainage provisions, and utility provisions. 6. Additional drawings, plans or information deemed necessary by the Secretary.. *Must be prepared by a registered architect or person registered with the State Board of Registration for Architects, Engineers and Land Surveyors, and said drawings/plans shall be so certified. NOTE: Upon approval of plans by the Council and prior to issuance of permits, a Performance Agreement as to approved site improvements and a supporting finan- cial guarantee, in an amount to be determined by the City, are required. Accept- able financial instruments include cash escrow; certificate of deposit; and performance bond. Copies of the Zoning Ordinance may be obtained from the Administrative Office. Questions should be directed to the Planning and Inspection Department. P/I Form No. 19 Planning Commission Information Sheet Application No. 81060 Applicant: DeVries Builders, Inc. Location: 67th Lane North Request: Site and Building Plan The applicant seeks site and building plan approval to construct 24 townhouses on the land described in Application No. 81061 as Earle Brown Farm Estates 2nd Addition, located at the southeast corner of Xerxes Avenue North and Freeway Boulevard extended. No new site plan has been submitted with this application. The original plan is unaltered except that 10 visitor parking spaces instead of 5 are provided within this subdivision. Landscaping includes 10 shade trees along Xerxes Avenue North, Freeway Boulevard and Xerxes Place North. Nine coniferous trees are also provided in the greenstrip areas. In addition, twelve decorative trees are shown in this area. No specie is yet indicated. Four foot (4') high berms are indicated in greenstrip areas along Freeway Boulevard and along Xerxes Avenue North. Drainage is collected in a single catch basin in 67th Place North and conveyed by a 21" storm sewer line to City storm sewer in Freeway Boulevard. This line also carries drainage from a holding pond to the southwest west of this phase. In general, the original plans seem to be in order and approval is recommended subject to at least the following conditions: 1. Building plans are subject to review and approval by the Building Official with respect to applicable codes prior to the issuance of permits. 2. Grading, drainage and utility plans are subject to review and approval by the City Engineer prior to the issuance of permits. 3. A performance agreement and supporting financial guarantee (in an amount to be determined by the City Manager) shall be submitted to assure completion of approved site improvements for phase one prior to the issuance of building permits. 4. Any outside trash disposal facilities shall be appropriately screened from view. 5. All common parking and driving areas shall be surrounded by B-612 curb and gutter as shown on the approved drainage and grading plans. 6. Plan approval acknowledges a master plan for all phases of the Earle Brown Farm Estates Townhouse project. However, each additional phase is subject to preliminary plat approval and site and building plan approval by the Planning Commission and City Council. 7. The developer shall take adequate measures to control dust and debris during construction. A viable turf shall be established and maintained in these areas subject to future development. 8. Phase Three of the Earle Brown Farm Estates shall be included in the single Homeowners Association for the entire development. 8-27-81 v 1 f " PAR S— c e81n AVE V Pf Cis • o / s• za w FREE •, e aAs zg i eL is 23 ••ti -'' - ,� U r y -0 TARWNHOUSES '7^ U E TOr e y -�, Cp : r < M 'a !g o� f �pT 8 pA14St rOy4„o� s g t `il �? y p> o t,, • ' jit CA s v c?�T.tr4 GEOTECHNICAL ENGINEERING CORPORATION 1925 Oakcrest Avenue - Roseville, Minnesota 55113 - (612) 636-7744 REPORT OF SOIL TESTING PROJECT: REPORTED TO: EARLE BROWN FARM ESTATES 3RD ADDITION, BLOCK 2, LOTS 1-4 BROOKLYN CENTER, MINNESOTA GEC JOB NO: 3069 DATE: MAY 12, 1982 DeVRIES BUILDERS, INC. 7564 MARINER DRIVE MAPLE GROVE, MINNESOTA 55369 CC: MERILA & ASSOCIATES, INC. BROOKLYN CENTER BLDG. INSPECTIONS INTRODUCTION This report contains the results of soil testing done in Lots 1 - 4 of Block 2 of the 3rd Addition at the Earle Brown Farm Estates site in Brooklyn Center, Minnesota. The soil testing included excavation ob- servations, hand auger borings, and field density tests. The referenced lots are identified as follows: ADDITION BLOCK LOT STREET ADDRESS 3 2 1 2924 67th Lane North 3 2 2 2928 67th Lane North 3 2 3 2932 67th Lane North 3 2 4 2936 67th Lane North BACKGROUND INFORMATION A Preliminary Site Evaluation conducted at the referenced site by Soil Ex- ploration Company was submitted to us by the client. The report was iden- tified as SEC #120-6252 and dated July 18, 1980. Logs of eighteen"soil borings taken by the client at the referenced site were also supplied to us. The soil borings were dated March 20, 1981. A letter by Soil Explora- tion Company addressing the additional evaluation of various townhouses and dated April 27, 1981, was also supplied to us. HYDROLOGY • SOIL AND FOUNDATION ENGINEERING • TEST BORINGS MATERIALS TESTING • PERCOLATION TESTING • ENGINEERING GEOLOGY • CONSTRUCTION TESTING GEC #3069 - Page 2 DESIGN INFORMATION It is our understanding that the proposed buildings will be of wood frame construction and two stories in height, will be constructed slab -on -grade, perimeter footings will bear at an elevation of approximately 845.3, will have a finished floor grade of approximately 849.5 to 850, will have nor- mal tolerance to settlement, will be of conventional design and construc- tion, and will be constructed in accordance with the U. S. Department of Housing and Urban Development and applicable building code requirements. OBSERVATION METHODS AND RESULTS Observations: The client requested that we examine the base of the exca- vation in the area of Lots 1 - 4 of Block 2 of the 3rd Addition on Ap- ril 2, 1982. At that time, a visual examination of the building area in- dicated stripping operations had taken place. The excavation appeared to be deepest along the north end of Lots 1 - 4 and it sloped upward toward the south. The northwest corner of the excavation had not been completed. The exca- vator was present and told us that a backhoe would be used -to complete the excavation in the northeast corner the following Monday. At that time we also recommended that pockets of organic soils that were exposed through- out the excavation be removed. The thickness of the organic soils was rela- tively thin (generally 1/2' or less). On April 5, 1982, a backhoe was present and excavated the Brea of the north- west building corner. We were present to observe the base of the excavation and oversize. We put down hand auger borings throughout the base of the ex- cavation; natural inorganic soils were encountered in the hand auger borings. GEC GEC #3069 - Page 3 Elevations of the base of the excavations were determined. The elevations were referenced to the first floor slab elevation of the townhouse located in Block 8 of the 1st Addition. The first floor of that townhouse, accord- ing to the Development Plan of the site supplied to us by the client, is 851. The elevations that we observed at the approximate northeast, north- west,'southwest, and southeast building corners were 849, 840, 8442, and 849, respectively. Oversize appeared adequate. Approximate building corner stakes were present at the southwest and southeast building corners of Lots 4 and 1, respectively. Field Density Tests: During the period of April 13 - 16, 1982, we conducted nine field density tests in the fill placed in the area of Lots 1 - 4 of Block 2 of the 3rd Addition. The results of the tests are attached. CONCLUSIONS Based on the results of our observations and field density tests, it is our opinion that earthwork in the area of Lots 1 - 4 of Block 2 of the 3rd Addi- tion have been done in a suitable manner and in accordance with HUD guidelines As the garage areas are filled to attain garage slab grade, the compaction of the backfill should be tested to ascertain whether compaction specifications are being met. CLOSURE To protect the addressee, the public, and ourselves, this report (and all supporting information) is provided for the addressee's own use. No repre- sentations are made to parties other than the addressee. Report Prepared �By: Charles W. Bisek Under the Supervision of: Robert E. Pende. Bast, , _.. MN Reg. No. 8450 GEC GEOTECHNICAL ENGINEERING CORPORATION 1925 Oakcrest Avenue • Roseville, Minnesota 55113 • (612) 636-7744 REPORT OF DENSITY TESTS PROJECT: EARLE BROWN FARM ESTATES 3RD ADDITION, BLOCK 2, LOTS 1-4 BROOKLYN CENTER, MINNESOTA GEC JOB NO= 3069 DATE: MAY 12, 1982 REPORT NO: 3069 REPORTED TO: DeVRIES BUILDERS, INC. 7564 MARINER DRIVE MAPLE GROVE, MINNESOTA 55369 COPIES TO: MERILA & ASSOCIATES, INC. BROOKLYN CENTER BLDG. INSPECTIONS FIELD DENSITY TEST DATA Test No. Test Date Test Location Elev 14106 Dry Dens. Mois. Con, +4 % Proc. No. Relative De Remarks pcf1 %ity 4/13 3rd Addition; Block 2 - 840.3 104.8 17.3 8 6 952 Lot 4 2 4/13 3rd Addition; Block 2 - 841.8 117.4 6.3 11 4 104 Lot 4 3 4/14 3rd Addition; Block 2 - 844.0 116.8 9.8 8 3 99 Lot 4 4 4/14 3rd Addition; Block 2 - 843.0 116.5 7.9 4 4 103 Lot 4 5 4/14 3rd Addition; Block 2 - 843.8 119.0 10.7 12 3 101 Lot 1 6 4/15 3rd Addition; Block - 845.2 127.1 1Q.0 8 _5 104 Lot 1 7 4/15 3rd Addition; Block 2 - 845.0 122.7 9.8 8 5 100 Lot 3 8 4/16 3rd Addition; Block 2 - 846.0 128.3 10.1 6 5 105 Lot 2 9 4/16 3rd Addition; Block 2 - 846.1 126.6 10.7 9 5 103a Lot 3 Method; Sand Cone(ASTM D1556) X ;Nuclear (ASTM D2992) ;Balloon(ASTM D2167) LABORATORY MOISTURE -DENSITY RELATIONS OF SOILS 1PROCTORI No Soil Opt. Mois. Max. Dry Description Con ent Density Dcf Results of Proctor tests previously reported. Refer to reports of GEC Job No. 2905 - 2905B. Procedure & Methods Standard (ASTM D698) X ;Method ;Modified (ASTM D1557) io prot•<t th• add mr•u••, Ih• p blir, and our.•Iv., Ih i, rsport land all GEOTECHNICAL ENGINEERING CORPORATION wpportinp nl r anon) i, pro vid•d for th• oddr•..••.. own u.•. No r•pn.•ntation, ar• �'J m.d•to Wli•, oth-.r than Ih• oddr•t+. •. C ar es 1se GEOTECHNICAL ENGINEERING CORP ATION 1925 Oakcrest Avenue a Roseville, Minnesota 55113 - (612) 636-7744y REPORT OF DENSITY TESTS PROJECT: EARLE BROWN FARM ESTATES 3RD ADDITION, BLOCK 2, LOTS 1-4 BROOKLYN CENTER, MINNESOTA REPORTED TO: DeVRIES BUILDERS, INC. 7564 MARINER DRIVE MAPLE GROVE, MINNESOTA 55369 GEC JOB NO: 3196 COPIES TO: DATE: SEPTEMBER 17, 1982 MERILA & ASSOCIATES, INC. 3196-1 BROOKLYN CENTER BUILDING INSPECTIONS REPORT NO: U.S. DEPT. OF HOUSING & URBAN DEVELOP. FIELD DENSITY TEST DATA Test No. Test Date Test Location �@�_ [FLEW Dry p�f ' Mois. C%n' +4 % Proc. No. Relative Density Remarks 1 9/13/82 3rd Addition; Block 2, 848.7 116.7 11.3 3 3 98 Lot 1 2 9/13/82 3rd Addition; Block 2, 848.0 113.8 12.9 3 3 96 Lot 4 3 9/13/82 3rd Addition; Block 2, 848.0 113.1 13.2 3 3 95 Lot 4 4 9/13/82 3rd Addition; Block 2, 848.7 114.2 12.9 4 3 96 Lot 4 REMARKS The results of excavation observations and field density tests previously conducted at the referenced site were included in the report of GEC Job No. 3069 dated May 12, 1982. romri IICTONc Based on the results of our excavation observations and field density tests, it is our opinon that earthwork has been done in a suitable manner and in accordance with HUD guidelines in Lots 1 - 4 of Block 2 of the 3rd Addition. Method: Sand Cone(ASTM D1556) ;Nuclear (ASTM D2992) X ;Balloon(ASTM D2167) LABORATORY MOISTURE -DENSITY RELATIONS OF SOILS (PROCTOR) Soil Oppt. Mois. Max. Dry No• Description Go %ent Dep�fty Results of the Proctor test were previously reported. Refer to the reports of GEC Job No. 2905 - 2905B. Procedure & Method: Standard (ASTM D698)—X ;Method _A ;Modified (ASTM D1557) GEOTECHNICAL ENGINEERING CORPORATION To protect the addressee, th• public, and ourselves, this report land all supporting information) is provided for the addressee's own use. No representations are made to parties other than the addressee. Robert E. Pen ergast