Loading...
HomeMy WebLinkAboutPC64110 - 1/7/65 - 6901 Osseo RoadVILLAGE OF BROOKLYN CENTER Zoning Application Street Location of Property 6901 (Osseo Road Legal Description of Property ut , flock 1,Sunset Manor A(ld ition Owner: Name Pur(:Oil Comnany Address 1306 South Fifth S-�ri­t Applicant: Name • Address Phone'39-0 1 Type of Request: Rezoning Special Use Permit Variance Subdivision Approval Other Description of Request See memo atta Reason for Request NOTE - Sketch of proposea property ana structure u to be drawn on back of this form or �� �Qe attached. _ 1),G � ApY pli cy ant) Fee: (Date) Following to be filled in by Village Recommendations of Village Officials Chronology Date By Rec'd. Published On PI.Comm. Agenda Pl. Comm, fiction On Council Agenda Council Postponement Council Action Bldg. Deft. Notified Applicant Notified P1. Comm. Postponement Any official making any comments should sign and date. Use additional sheet comments if necessary attach hereto. Please draw or attach sketch of proposed structure showing the following: 1. Indicate North 6. Dimensions of proposed structure 2. Location on lots. 7. Proposed set -backs 3. Adjacent street names 8. State zoning in force in area 4. Location set -backs and use of adjacent existing buildings 5. Distances between any proposed structures and structures on adjacent Drooerty. (To Be Filled in By Planning Commission) PLANNING COMMISSION RECOMMENDATIONS On the I day of fy�� the action requested in the foregoing petition was appr d (1,f disapproved t ) subject to the following conditions: Chairman ✓ � �� COUNCIL RECOMMEND�;ION3 Approved Denied by the Council this `day of r ti 19�'✓ Approved with following amendment. Clerk: / • ° VILLAGE Or, BROOKL'P] LENTEE3+p�=. Jca;�io i''o._..... d411inq Applicataor. Street Location of property 6901 Osseo Road _.....__ _.. Legal Description of property Lot 7,Sect-1 Sunset Manor Addition__ Owner4, Name —Pure Oil Comm, _ Address 1306 Soul► Fifth Street Phone Applicant: Name _ V. C. Moonev Address No.jg2--wal Type of Request: N Rezoning Special Use hermit ..x... Y. Other X Variance Subdivision Approval Description of request _ _ Seg �ie,w n tt ac hod . Reason for Ku ques t Building ns� ector.s Remarks No Comment _.. _.v._.._...� ...� .� ....._... Applicants Sketch Filed __ . Yes Ai,4 ndk Stretch a;':ach d --Yes _ Street Acc::�Ss Yes Yes Note: '_cie : r , pvo; csed property and structure to '!1e draun oil back, of M is Yo'.-':E v^r —Tolle THE PURE OIL C011HPAINY Applicalii: triU011 v� I Ly C G ir' To: Planning Commission SUb;;ect: Planning CoMission Application #64110 From: Secretary of Planning Commission Date: December 15, 1964 Tile Pure Oil Company proposes to remove the service station at 6901 Osseo ,load and build a new 3 bay station to replace it. The lot on vibich the station is located is zoned R-3. The adjoining lot on the north side is zoned tR-B and is occupied by an old two story dz?elling. The adjoining lot on the west side is zoned R-1 and is occupied by a 11/21 story four unit apartment building. Service stations are a special use in B--3 districts, providing they do not abut a lot 4a a R--1 or Ii-B district, however, a service station may be constructed on such a lot if the abutting lot is occupied by n building other than a dwelling or an accessory thereto. The special use permit for the service station was issued in 1954 with the present zoningy ordinance being adopted in 1957 and amended in 1961 to prohibit a service station on a lot abutting a lot in an R-1 district and further ameaded in 1964 to piohibiL 6hem on lots n1butting l can 11—B district. Due to the land tatting for the highway and the changes in street grades, the service drives and approaches have become unusable. The location of the E: istirQ building, puraps and tanks malere it impractical to reconstruct the servico area and a hardship to the owner would result if tl?e strict letter of the regulations were to be carried out. The ;Mans and specifications submitted by the Pure Gil Company for the reconstruction of the service station do not conform to all the requirements of the zoning ordinance, so the petitioner requests that consideration be giver to the fcllc.-:ing, variances: v, 1. The service station abuts an R-i and adjoins an R-B use district. - 2. The building set pack .from the East and gout, is less ;.hall 90 feet fromthe centerline of the street. /3. The 10 foot building setback from the North side and from the t'dest side is less than the 25 'teat setback r awed bu v section 35-401 (*3) . the Fc-o- ` i:v i' i% OSC" Ot Allig.i Si( 11 :".I LilE3 ?.lt{:L T J ^..`' ?� i 3 i;?? cc��/ t:?I`�_tinl:F1 it�T fe e L;i�II/ve/C:7r (' e. Pane 2 After due consideration of the application, the Planning Commission could make one of the following recommendations. 1. Approval of the application as submitted, 2. Approval of the application with such conditions and restrictions upon the establishment, location, construction and operation of the special rise as doemed necessary for the p:oiection of the public interest and to secure compliance with the r equire?sents specified in the ordinances, 3. Denial of the application. 4. Table the application for consideration at a later date but not longer than 30 days,