HomeMy WebLinkAboutPC87015 - 7/30/87 - 7100 Brooklyn BlvdP%-,.NNING COMMISSION FILE Ch,,,.:KLIST
File Purge Date:
FILE INFORMATION
Project Number:
PROPERTY INFORMATION
Zoning: �s
PLAN REFERENCE
Note: If a plan was found in the file during the purge process, it was pulled for consolidation of all
plans. Identified below are the types of plans, If any, that were consolidated.
• Site Plans
• Building Plans
• Other: l and s c've
el-evcAtlGr�S
q raeA lny
Sewef
FILE REFERENCE
Note: The following documents were purged when this project file became inactive. We have
recorded the information necessary to retrieve the documents.
Document Tyne Date Range Location
Agendas: Planning Commission Office
Minutes: Planning Commission 113% 7 City Vault
Minutes: City Council <MoI8 7 City Vault
Document Tyle Number Location
Resolutions: Planning Commission City Vault
Resolutions: City Council City Vault
Ordinances: City Council City Vault
COMMERCIAL/INDUSTRIAL PROPERTY FILES CHECKLIST
Planning Commission Information Sheet
Application No. 87015
Applicant: Uhde/Nelson, Inc.
Location: 7100 Brooklyn Boulevard
Request: Site and Building Plan/Special Use Permit
Location/Use
The applicant requests site and building plan and special use permit approval to
construct an 8,068 sq. ft. office building at 7100 Brooklyn Boulevard. The land in
question is zoned R5 and is bounded on the north by single-family residences, on the
east by a single-family residence and a portion of the parking lot for the Boulevard
Plaza office condos, on the south by Boulevard Plaza, and on the west by the Edina
Realty building at 7100 Brookyn Boulevard (phase one of this development). Office
buildings are allowed by special use permit in the R5 zoning district.
Access/Parking
Access to the proposed building would be from Brooklyn Boulevard through the parking
lot of the first phase building (Edina Realty). An access easement to this
landlocked parcel was executed with the plat that split the property in 1985. The
site plans calls for 41 parking stalls, only two-thirds of a stall more than required
for general office use of the building. With this number of stalls, only about 400
sq. ft. of floor area can be devoted to medical occupancy of the building. The
parking layout provides a 15' buffer adjacent to the single-family lots and a 5'
greenstrip adjacent to the Boulevard Plaza parking lot. Staff recommend that the
15' buffer be continued adjacent to the Boulevard Plaza parking lot so as to prevent
an unnecessary jog in the easterly row of parking stalls. Also an additional
concrete delineator is needed to delineate the east end of a row of parking stalls
north of the building.
Landscaping
The landscape plan calls for preservation of an existing cedar hedge along the north
and east sides of the site. In addition, the plan calls for eight (8) ornamental
trees ( Canada Red Cherry or Red Splendor Crab) in the perimeter buffer strips and at
the southeast corner of the building. Finally, the plan calls for 60 shrubs
adjacent to the building to include both evergreen shrubs and deciduous shrubs. No
shade trees are proposed in the phase two area. On the strength of the existing
cedar hedge, the proposed plan exceeds the point requirement (62.5 Pts.) of the
landscape point system.
Grading/Drainage/Utilities
The proposed grading plan calls for the parking lot to drain to a single catch basin
northeast of the proposed building. The catch basin will be connected by a 12"
storm sewer line to a 27" line under the westerly end of the St. Alphonsus Church
property. The building is to be served by a 6" water line that traverses this
development from Brooklyn Boulevard to a 6" watermain under the west end of the St.
Alphonsus Church property. A hydrant is proposed immediately north of the proposed
building. The sanitary sewer service will be connected by an existing pressure
line to sanitary sewer in Brooklyn Boulevard. The City Engineer, however, is
concerned that the depth of the sanitary sewer is insufficient and, in a normal
winter, will freeze up.
Building
The building is to have two entrances, the main one at the northwest corner of the
building and another on the south side of the building. The southerly entrance is
7-30-87 -1-
Application No. 87015 continued
to be accessed by a 5' wide sidewalk along the south side of the building to the
parking lot. The main entrance will have a small atrium open to the second floor.
The internal layout is speculative at this point, depending on tenant plans. The
exterior of the building is to be face brick with a metal mansard around the entire
building to match the existing Phase One building.
Lighting/Trash
Lighting for the site is to be provided by three 30' light standards with 250 watt
high pressure sodium (amber) luminaires. This should be more than adequate. No
provision has been made on the plan for a trash enclosure. This is a constant
concern at commercial sites and we recommend that the applicant be required to
address this issue at the Commission's meeting on Thursday.
Special Use Standards
Office uses are allowed in the R5 zone by special use permit. As such they are
subject to the standards contained in section 35-220.2 of the Zoning Ordinances
(attached). The applicant has submitted nothing in writing addressing the
standards and staff see no conflict with the standards posed by the proposed office
use. It should be noted that neighbors in the area have expressed a preference for
office use of the property as opposed to the apartment uses permitted by the R5
zoning of the property.
Recommendation
Based on the review contained above, staff recommend that approval be granted,
subject to at least the following conditions:
1. Building plans are subject to review and approval by the Building
Official with respect to applicable codes prior to the issuance
of permits.
2. Grading, drainage, utility and berming plans are subject to
review and approval by the City Engineer, prior to the issuance of
permits.
3. A site performance agreement and supporting financial guarantee
(in an amount to be determined by the City Manager) shall be
submitted prior to the issuance of permits.
4. Any outside trash disposal facilities and rooftop mechanical
equipment shall be appropriately screened from view.
5. The building is to be equipped with an automatic fire
extinguishing system to meet NFPA standards and shall be
connected to a central monitoring device in accordance with
Chapter 5 of the City Ordinances.
6. An underground irrigation system shall be installed in all
landscaped areas to facilitate site maintenance.
7. Plan approval is exclusive of all signery which is subject to
Chapter 34 of the City Ordinances.
8. B612 curb and gutter shall be provided around all parking and
driving areas.
7-30-87 -2-
Application No. 87015 continued
9. The applicant shall submit an as -built survey of the property
improvements and utility service lines, prior to release of the
performance guarantee.
10. The property owner shall enter into an easement and an agreement
for maintenance and inspection of utility and storm drainage
systems prior to the issuance of permits.
11. Fire hydrants shall be located on the site as per the order of the
Fire Marshal.
12. The special use permit is subject to all applicable codes,
ordinances, and regulations and any violation thereof may be
grounds for revocation.
13. The plans shall be modified prior to consideration by the City
Council to provide full delineation of parking stalls and
elimination of the jog in the parking row along the east side of
the property.
7-30-87 -3-
1
jHINGLE_
EAST
:=��. 7
1
I ; I %%
QUAIL 1\A
1�ICIRCLE�� �\
�% J* S 1
FIA
I"r roll
W 0 D
NIL LOW
LANE ��c.
SCHOOL
R5
a..�e
INE
L'A N E
71"ST 11AVE
APPLICATION NO.
R 87015
X
Q
tL
J
a
130 69TH
U.S. �0
w POST 61
w OFFICE AIL
G
68 T � �0�0
H AVE. 'A
log, IBM NEEMEM
mm
IM IMMI
ME mm
mm M
ijimmimul
w
2
:R TOWER
NO./I/ 2
U)
W I/---
�G
Jolla
s
loop
if