HomeMy WebLinkAboutPC79030 - 6/14/79 - Freeway Blvd� \...
PLANNING CONEUILSSION FILE CHECKLIST
File Purge Date: /211;G
FILE INFORMATION
Planning Commission Application No. 79030
PROPERTY INFORMATION
Zoning:
PLAN REFERENCE
Note: If a plan was found in the file during the purge process, it was pulled for
consolidation of all plans. Identified below are the types of plans, if any, that were
consolidated.
• Site Plans
4ti'ach�l �
• Building Plans zan, hg cLppl Jcahon
• Other: landxape
FILE REFERENCE
Note: The following documents were purged when this project file became inactive. We
have recorded the information necessary to retrieve the documents.
Document Tyr)e Date Range Location
Agenda Cover Sheet: Planning Commission Agenda Book
Minutes: Planning Commission
Minutes: City Council
Resolutions: Planning Commission
Resolutions: City Council
Ordinances: City Council
G111179 2 �2,h/ecd,
-719l-79
City Vault
City Vault
City Vault
City Vault
City Vault
Historical Photographs: Planning Commission City Archieve
CITY OF BROOKLYN CENTER
Street Location of Property
Legal Description of Property
PLANNING COMMISSION ZONING APPLICATION
Application No.
Please Print Clearly or Type
Freeway Blvd.
79030
Owner Brooklyn Center Industrial Park
Address 61o0 Summit Drive Phone No, 561-73.50 X
Applicant Same _. T....
Address
Type of Request: Rezoning
Variance
Phone No.
Subdivision Approval
X Site & Bldg. Plan Approval
Special Use Permit Other:
Description of Request: Shingle Creek Plaza (Spec. 10)
Fee $ 25.00
Receipt No. 50947
Ap cant s Sign `t re
May 23 1979
Date
PLANNING COMMISSION RECOMMENDATION
Dates of P.C. Consideration: %- G> - /y—`�,/
Approved L/_ Denied this ��day of 19 subject to the follow-
ing cond-'Ktions.
CITY COUNCIL ACTION
Dates of Council Consideration:
airman
Approved Denied this `j day of 19 7 �F, with the following
amendment:
Clerk
P/I Form No. 18 (over please)
Planning Commission Information Sheet
Application No. 79030
Applicant: Brooklyn Center Industrial.Park
Location: Freeway Boulevard, west of Schmitt Music
Request: Site and Building Plan Approval
The applicant seeks site and building plan approval for an approximate 140,000
square foot speculative industrial complex west of Schmitt Music on Freeway
Boulevard. The application was tabled at the June 14 Planning Commission
meeting. At that time, the Commission directed the applicant to submit revised
plans providing for a 140 foot separation between two buildings which is proposed
to be a paved loading dock and driveway area. The Commission also directed
that the plans also be modified to provide a 50 ft. setback for the building facing
Freeway Boulevard.
The applicant has submitted a new plan incorporating these changes. The
buildings are staggered such that the 140 feet can be maintained with a minimum
reduction in the size of the building.
For other aspects of the proposed plan, the Commission is referred to the previous
information sheet (attached).
Approval of site and building plans is recommended subject to the following
conditions:
I. The building plans are subject to review and approval by the Building
Official with respect to applicable codes .prior to the issuance of
permits.
2. Grading, drainage and utility plans are subject to review and
approval by the City Engineer prior to the issuance of permits.
3. A Performance Agreement and supporting financial guaranteee
(in an amount to be determined by the City 1-lanager) shall be
submitted to assure completion of approved site improvements.
4. The building shall be equipped with an automatic fire extinguishing
system to meet NFPA .)Lanaard No. 13 and shall be connected to a
central monitoring device in accordance with Chapter 5 of the City
Ordinances.
5. All outside trash disposal equipment and/or rooftop mechanical
equipment shall be appropriately screened from view.
6. B-612 concrete curb and gutter shall be.provided around all
driving and parking areas.
7. The plan shall be modified to provide a 50 ft. building
--setback off Freeway Boulevard which is a major thoroughfare.
8. An underground irrigation system shall be provided in all sodded
and planting areas to facilitate site maintenance. The irrigation
system shall not be required in areas by Shingle Creek ►There
natural ground cover will continue to exist.
6-28-79 -1-
f
Application No. 79030
9. Plan approval is exclusive of all signery which is subject
to the requirements of Chapter 34 of the City Ordinances.
1.0. A standard utility maintenance agreement approved by the
City Engineer shall be executed prior to the issuance of
permits.
6-28-79 -2-
Planning Commission Information Sheet
Application No. 79030
Applicant: Brooklyn Center Industrial Park
Location: Freeway Boulevard
Request: Site and Building Plan Approval
The applicant is seeking site and building plan approval to construct three
speculative buildings totaling approximately 140,000 sq. ft. on a 13 acre site and is
located on Freeway Boulevard, westerly of Schmitt Music. it is bounded on the
south by Freeway Boulevard, on the west by vacant industrially zoned property,
on the east by the Schmitt Music site and on the north by Shingle Creek.
Building No. 1 would be 47,600 sq. ft., Building No. 2 would be 30,900 sq. ft.
and Building No. 3 would be 60,200 sq. ft. The applicant has shown parking for
262 cars which comprehends that approximately 15% of each building could be used
for offices with the remaining portion to be used for manufacturing and storage.
Additional space is available on the site which could be used for more parking
if needed.
There is a 50 ft. building setback off Freeway Boulevard which is designated as
a major thoroughfare. There is a discrepancy on the plan at the southeast
corner of Building No. 1, which does not meet setback requirements. The plan
will have to be modified to accurately reflect the required building setback.
Another concern we have with the site plan is an approximate 120 ft. area between
Building No. 1 and Building No. 2 which is comprehended as a loading dock area.
It is questionable, depending on the location of the loading docks whether two
semi -trucks could be docked facing each other and still provide a driving lane.
Generally, about 135 to 140 feet is provided in such areas. An existing 25 ft.
sanitary sewer easement runs in a southeasterly direction at about the center of
the site from west to east for approximately 635 feet and then heads in a southerly
direction towards Freeway Boulevard. Buildings cannot be located over this type
of easement, but can be built up to it.
The exterior of the buildings would be a vertical scored painted concrete block
with cedar siding on the office side and ends of the buildings. The same vertical
scored painted concrete block with an offsetting painted break off block would be
used on the loading dock side of the buildings.
He proposes berming along Freeway Boulevard to screen parking lot areas as well
as berming around the parking lot area that would face Shingle Creek. Hackberry,
locust and spruce trees would be used in the landscape treatment as well as sumac,
mock orange and Japanese barberries.
Approval of this application should be subject to at least the following conditions:
1. The building plans are subject to review and approval by the Building
Official with respect to applicable codes prior to the issuance of
permits.
2. Grading, drainage and utility plans are subject to review and
approval by the City Engineer prior to the issuance of permits.
3. A Performance Agreement and supporting financial guaranteee
(in an amount to be determined by the City Manager) shall be
submitted to assure completion of approved site improvements.
6-14-79 -1-
•Application No. 79030
4. The building shall be equipped with an automatic fire extinguishing
system to meet NFPA Standard No. 13 and shall be connected to a
central monitoring device in accordance with Chapter 5 of the City
Ordinances.
5. All outside trash disposal equipment and/or rooftop mechanical
equipment shall be appropriately screened from view.
6. B-612 concrete curb and gutter shall be provided around all
driving and parking areas.
7. The plan shall be modified to provide a 50 ft. building
setback off Freeway Boulevard which is a major thoroughfare.
8. An underground irrigation system shall be provided in all sodded
and planting areas to facilitate site maintenance. The irrigation
system shall not be required in areas by Shingle Creek where
natural ground cover will continue to exist.
9. Plan approval is exclusive of all signery which is subject to the
requirements of Chapter 34 of the City Ordinances.
6-14-79 -2-