Loading...
HomeMy WebLinkAbout2011-006 - 1700 Freeway Blvd FULL PACKETG7h•of BROOKL Y /V CEIYTER Planning Commission Application Please Print Clearly or Type Address/Street Location of Property 1700 /'re e w A y Giyr,� Legal Description of Property to /d G,% h 4Y-c l at' qie ct cl j' ✓ /y H I&Jrn e,ot'r) Co A preliminary meeting with the Planning Staff is required prior to the submission of a Planning Commission application. No application will be accepted prior to such meeting. Applicant Information: Name '�ro d) sl 4 w Address %Zo Q free'► c, Y 131Vd Phone(763)65 Z-67)$ Fax (763) Email -670dd. Shc:-v @ preCSlo(,-%hc,,C't+M Owner Information: Name /700 f feClwctu, �4 1/-/ c Address 1�0® F"'eew4V '31`'�it Phone�763> 6)W90 Fax (7,b3) 5`-G S-v Email tw11 r5� Iw@ �rec;5i;t,--ihc,6v Type of Request: Rezoning ($1050) ❑ Subdivision Approval ($300) Planned Unit Development ($1800) Variance ($200) 17 Special Use Permit ($200) Site & Building Plan Approval ($750) Appeal ($200) Other: Description of Request: '4h l h �c,S �"�74 ��d% . 7��t G �� e � h 5/ ej � Ate, � he /a61, 0 ex 5 �h S d�%V-e -7 0 0 ✓^I^2 w ri j �1% �� Application Fee $ //e0oIOD AcctNo. 10100-4403 Receipt No. (05 6 `T The applicant requests processing of this application and agrees to pay to the City of Brooklyn Center, within fifteen (15) days after mailing or delivery of the billing statement, the actual costs incurred by the City for Engineering, Planning and Legal expenses reasonably and necessarily required by the City for the processing of the application. Such costs will be in addition to the application fee described herein. Withdrawal of the application will not relieve the applicant of the obligation to pay costs incurred priorU withdrawal. Applicant (Please Print) Applican s Signature Page 1 City of Brooklyn -Center - Business and Development - 6301 Shingle Creek Pkwy - Brooklyn Center MN SS430 763-S69-3300 Planning Commission Application Form 9-10 City Use Only City Use Only City Use Only Planning Commission Recommendation Dates of PC Consideration: 3 Action Taken: Approved Resolution No. 0 0 rV Approved ❑ Denied this day of 20 subject to the following conditions: Chairman City Council Action Dates of Council Consideration: - -` Action Taken: Approved Resolution No. Ao H - ; 10 Approved ❑ Denied this 0�day of 20 , with the following amendment: Clerk/Planning Commission Secretary Page 2 City of Brooklyn Center - Business and Development - 6301 Shingle Creek Pkwy - Brooklyn Center MN SS430 763-569-3300 Planning Commission Application Form 9-10 XCity of Planning Commission ByrooH n Center www.ciryojbrooklyncenter.org 6301 Shingle Creek Parkway, Brooklyn Center, Minnesota 55430-2199 Phone 763.569.3300 'ITYNoice 71 l Fax 763.569.3494 April 4, 2011. Todd Shaw 1800 Freeway Blvd Brooklyn Center, MN 55430 Dear Mr. Shaw: This letter is to inform you of the action taken regarding Planning Commission Application No. 2011-006. Enclosed is an excerpt from the minutes of the Planning Commission meeting, the City Council meeting and the Planning Commission Information Sheet pertaining to your application for Preliminary Plat/Subdivision approval. If you have questions or comments regarding this matter, please contact me. Sincerely, Tim Benetti Planning Commission Secretary Enclosures Application Filed on 2-18-10 City Council Action Should Be Taken By 4-19-10 (60 Days) Planning Commission Information Sheet Application No. 2011-006 Applicant: Todd Shaw on behalf of Precision Incorporated Location: Northeast Quadrant of Freeway Boulevard and James Avenue North (1700 Freeway Boulevard) Request: Rezoning Approval to Establish a PUD to Facilitate an Expansion of the Parking Lot and Repurposing of this Industrial Building from Warehousing to Manufacturing The applicant, Todd Shaw, on behalf of Precision, Inc. is seeking to rezone Lot 1, Block 1, Interchange Addition, from I-1 to PUD/I-1 as part of the redevelopment/renovation plans for this existing 45,000 sq. ft. industrial building and expansion of its parking lot. BACKGROUND INFORMATION On January 27, 2011, the Planning Commission considered the potential relocation of an existing Brooklyn Center manufacturing use into the vacant industrial building at 1700 Freeway Boulevard and the possible use of the Planned Unit Development ordinance to establish flexibility in allowing the expansion of the existing one-way angled parking (accessed from Freeway Boulevard) to a double sided parking lot with a relocation of the driveway unto James Avenue. The discussion at that time included considerations to;preserving the existing boulevard trees and the possible use of parking lot materials that would not increase the rate of storm water runoff. On February 17, 2011, the Planning Commission unanimously moved to recommend conceptual approval which allowed an expansion of the parking lot that encroached upon the standard 15 foot front yard setback with the use of rain gardens within the James Avenue North/ boulevard to address storm water runoff. ZONING This site is zoned I-1 (Industrial Park) and is indentified on the City's Comprehensive Plan as part of the City's 694 industrial area. This 2.77 acre site was developed in 1969 as part of an industrial development, known as Freeway Commerce Center. PLANNED UNIT DEVELOPMENT PROVISIONS/ STANDARDS Section 35-355 of the Zoning Ordinance provides for Planned Unit Developments (PUD) to promote flexibility in land development and redevelopment, preserve aesthetically significant and environmentally sensitive site features, conserves energy and ensures a high quality of design. 3-17-11 Page 1 The proposed use of a PUD allows the use of perimeter setback standards to provide green and open space from the existing neighborhood, flexibility in the location of interior lot lines, parking and structured parking setbacks, and the ability to deviate from the dedication of the standard side yard drainage and utility easements. The following minimum I-1 development standard is being requested to be modified to facilitate the expansion of the parking lot: • Parking setback from James Avenue North — 15 ft. to approximately 6 ft. The parking ratio used is, for industry and wholesale buildings and is one space for each two employees on a major shift or one per 800 sq. ft. of gross building area, whichever is greater. The ordinance requirement for this building is 56 parking stalls. PUD APPLICATION AND REVIEW PROCESS The PUD provisions require that a development include sufficient information and details which allows the evaluation of the plans to address the following criteria: 1. Compatibility of the plan with the standards, purposes and intent of the PUD ordinances. 2. Consistency of the Plan with the goals and policies of the Comprehensive Plan. 3. The impact of the Plan on the neighborhood in which it is to be located. 4. The adequacy of internal site organization, uses, densities, circulation, parking facilities, public facilities, recreational areas, open spaces, buffering, and landscaping. Attached for you review is a copy of development plan/site plan which illustrates the proposed expansion of the parking lot and relocation of the Freeway Boulevard entrance driveway to James Avenue. The plan illustrates how a maximum of 123 parking stalls could be accommodated on the lot, assuming a conversion of a significant portion of the rear loading area is used for parking. Precision Incorporated is currently operating as a tenant in approximately 20,000 sq. ft. of the 1800 Freeway Boulevard industrial building. A meeting with the applicant indicates that they have been a Brooklyn Center business for approximately 50 years during which their Transformer Manufacturing business has grown to 100 employees and has approximately $20M in production. They currently operate two shifts and believe that their business is well positioned to more than double in the foreseeable future. The building at 1700 Freeway Boulevard is a 45,000 sq.ft. building and with the expanded parking will facilitate their needs and desire to stay and grow in the City of Brooklyn Center. 3-17-11 Page 2 RECOMMENDATION It is recommended that a motion be made to approve Planning Commission Application No. 2011-006 by adoption of Planning Commission Resolution No. 2011-03 subject to the following conditions: 1. Execution of a PUD development agreement as prepared by the City Attorney. 2. Approval of a grading and planting plan for the rain gardens by the City Engineer. 3. Closure of the driveway entrance unto Freeway Boulevard and approval of a driveway permit for the James Ave. 3-17-11 Page 3 MINUTES OF THE PROCEEDINGS OF THE PLANNING COMMISSION OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPIN AND THE STATE OF MINNESOTA STUDY SESSION MARCH 17, 2011 CALL TO ORDER The Planning Commission meeting was called to order by Chair Rahn at 7:07 p.m. ROLL CALL Chair Sean Rahn, Commissioners Kara Kuykendall, Stan Leino, Rachel Morey, Michael Parks, and Stephen Schonning were present. Also present were Secretary to the Planning Commission/Director of Business & Development, Gary Eitel, Planning and Zoning Specialist Tim Benetti, Councilmember Carol Kleven, City Manager Curt Boganey and Planning Commission Recording Secretary Rebecca Crass. Commissioner Carlos Morgan was absent and unexcused. APPROVAL OF MINUTES — MARCH 10, 2011 There was a motion by Commissioner Morey, seconded by Commissioner Schonning,to approve the minutes of the March 10, 2011 meeting as submitted. The motion passed. CHAIR'S EXPLANATION Chair Rahn explained the Planning Commission's role as an advisory body. One of the Commission's functions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. APPLICATION NO 2011-006 TOD SHAW FOR PRECISION_MACHINE, INC. Chair Rahn introduced Application No. 2011-006, a request for Planned Unit Development approval to rezone 1700 Freeway Boulevard from I-1 (Industrial) to PUD/I-1 (Planned Unit Development/Industrial) as part of the redevelopment/renovation plans for this existing 45,000 sq. ft. industrial building and expansion of its parking lot. Mr. Eitel presented the staff report and explained that on January 27, 2011, the Planning Commission considered the potential relocation of an existing Brooklyn Center manufacturing use into the vacant industrial building at 1700 Freeway Boulevard and the possible use of the Planned Unit Development ordinance to establish flexibility in allowing the expansion of the existing one-way angled parking (accessed from Freeway Boulevard) to a double sided parking lot with a relocation of the driveway unto James Avenue. The discussion at that time included considerations to preserving the existing boulevard trees and the possible use of parking lot materials that would not increase the rate of storm water runoff. Commissioner Parks arrived at 7:11 p.m. 3-17-11 Page 1 He added that on February 17, 2011, the Planning Commission unanimously moved to recommend conceptual approval which allowed an expansion of the parking lot that encroached upon the standard 15 foot front yard setback with the use of rain gardens within the James Avenue North/ boulevard to address storm water runoff. PUBLIC HEARING — APPLICATION NO.2011-006 There was a motion by Commissioner Morey, seconded by Commissioner Kuykendall, to open the public hearing on Application No. 2011-006, at 7:16 p.m. The motion passed unanimously. Chair Rahn called for comments from the public. Mr. Todd Shaw, representing Precision Machine, Inc. stated that the company has been in Brooklyn Center for over 50 years when the business was located near 50`h and France as Cass Screw. At that time there were 15 employees and with the expanding business they now have 100 employees with 20,000 sq. ft. for industrial space and hope to double that with this move. No other persons from the public appeared before the Commission during the public hearing on Application No. 2011-006. CLOSE PUBLIC HEARING There was a motion by Commissioner Kuykendall, seconded by Commissioner Morey, to close the public hearing on Application No. 2011-006, at 7:17 p.m. The motion passed unanimously. The Chair called for further discussion or questions from the Commissioners. Commissioner Parks asked for clarification about the drain tile within the rain garden treatment area. Mr. Eitel responded that the applicant took the initiative to suggest the rain garden treatment which allows proper drainage and eliminates standing water on the site. He added that the City Engineer will review and approve the plans prior to installation and that the intention is for water treatment not water retention. He added that there is percolation with this process that allows for drainage through the tile system. Commissioner Leino arrived at 7:20 p.m. The Commissioners interposed no objections to approval of the Application. ACTION TO RECOMMEND APPROVAL OF PLANNING COMMISSION RESOLUTION NO. 2011-03 There was a motion by Commissioner Kuykendall, seconded by Commissioner Parks, to recommend to the City Council that it approve Planning Commission Resolution No. 2011-03 regarding the recommended disposition of Planning Commission Application No. 2011-006, submitted by Todd Shaw for Precision Machine, Inc. for Planned Unit Development Approval to rezone 1700 Freeway Boulevard from I-1 (Industrial) to PUD/I-1, (Planned Unit Development/ Industrial). 3-17-11 Page 2 Voting in favor: Chair Rahn, Commissioners Kuykendall, Leino, Morey, Parks, -,and Schonning. And the following voted against the same: None Whereupon said resolution as declared duly passed and adopted. Planning Commission Resolution 2011-03 is made part of these minutes by attachment. The Council will consider the application at its March 28, 2011 meeting. The applicant must be present. Major changes to the application as reviewed by the Planning Commission will require that the application be returned to the Commission for reconsideration. APPLICATION NO.2011-004 — LOREN VAN DER SLIK FOR GATLIN DEVELOPMENT COMPANY, INC. Chair Rahn introduced Application No. 2011-004, a request from Loren Van Der Slik for Gatlin Development Company, Inc., for Preliminary Plat Approval of' Shingle Creek Crossing, the replat of the Brookdale properties into four lots and two outlots to facilitate Phase I of the Shingle Creek Crossing PUD. Mr. Eitel explained that the replating of the Brookdale Mall properties, excluding the Sears, Midas and Kohl's parcels, is part of the first phase improvements and development of the Shingle Creek Crossing PUD. He added that the property is zoned PUD/C-2 (Commerce District) and is located within the City's Central Commerce (CC) Overlay District. Mr. Eitel stated that based on a review and report by the City Engineer, there are a number of issues which may involve changes to be made to the preliminary plat and should be addressed before a Planning Commission recommendation is forwarded to the City Council. He described several easements on the site related to drainage, utilities, and trailways that are shown on the preliminary plat to be dedicated with the final plat. Mr. Eitel stated that it is Staff s recommendation that the Application be tabled and the public hearing continued at the March 31, 2011 meeting. Commissioner Leino stated that it appears that. the previous legal showing Torrens and Certificate of Title doesn't show that the easements were properly laid out in the legal description and asked if through the replat are we dedicating new easements? Mr. Eitel stated that is correct and added all underlying easements on the plat will be vacated and the new public easements will be dedicated at that time. PUBLIC HEARING — APPLICATION NO.2011-004 There was a motion by Commissioner Leino, seconded by Commissioner Morey, to open the public hearing on Application No. 2011-004, at 7:42 p.m. The motion passed unanimously. Chair Rahn called for comments from the public. Mr. Frank Gatlin, representing Gatlin Development, introduced himself and asked, if there are any questions from the Commissioners. 3-17-11 Page 3 Motion passed unanimously. 9. PLANNING COMMISSION ITEMS 9a. PLANNING COMMISSION APPLICATION NO. 2011-006 SUBMITTED BY TODD SHAW FOR PRECISION MACHINE, INC. REQUEST FOR PUD AMENDMENT APPROVAL TO REZONE 1700 FREEWAY BOULEVARD FROM I-1 (INDUSTRIAL) TO PUD/1-1 (PLANNED UNIT DEVELOPMENT/ INDUSTRIAL) TO FACILITATE AN EXPANSION OF THE PARKING LOT AND RE PURPOSING OF THIS INDUSTRIAL BUILDING FROM WAREHOUSING TO MANUFACTURING Mr. Eitel provided an overview of Planning Commission Application No. 2011-006 to relocate an existing manufacturing use into the vacant industrial building at 1700 Freeway Boulevard and use of the Planned Unit Development (PUD) ordinance to establish flexibility in allowing expansion of the existing one-way angled parking to a double sided parking lot with a relocation of the driveway unto James Avenue. It was noted that this vacant office/warehouse building would be repurposed with minimal parking lot revision for a manufacturing facility that has been in Brooklyn Center since the 1950s. Presently they have 100 employees, operate two shifts, and this application will accommodate anticipated growth. Mr. Eitel advised of the Planning Commission's consideration and unanimous recommendation for approval of the requested PUD amendment subject to three conditions as detailed in the resolution. 1. RESOLUTION NO. 2011-52 REGARDING DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2011-006 SUBMITTED BY TODD SHAW FOR PRECISION MACHINE, INC. (1700 FREEWAY BOULEVARD) Councilmember Roche moved and Councilmember Kleven seconded to approve RESOLUTION NO. 2011-52, Regarding the Disposition of Planning Commission Application No. 2011-006 Submitted by Todd Shaw for Precision Machine, Inc. (1700 Freeway Boulevard) The Council indicated that while it is aggressive in the redevelopment of the City, it does not want to exclude companies that have been in Brooklyn Center for years. The Council extended its appreciation to Precision Machine for deciding to expand its business in Brooklyn Center and complemented the owners on the site's landscaping. Motion passed unanimously. 10. COUNCIL CONSIDERATION ITEMS None. 03/28/11 -7- DRAFT Member Kuykendall introduced the following resolution and moved its adoption: PLANNING COMMISSION RESOLUTION NO. 2011-03 RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2011-006 SUBMITTED BY TODD SHAW FOR PRECISION MACHINE, INC WHEREAS, Planning Commission Application No. 2011-006 submitted by Todd Shaw for Precision Machine, Inc. proposes rezoning from I-1 (Industrial Park) to PUD/I-1 (Planned Unit Development/Industrial Park) of a 2.77 acre lot; and WHEREAS, the proposal comprehends the rezoning of the above mentioned property and renovation and repurposing of a 45,000 sq.ft. industrial/warehouse building and expansion of its parking lot; and WHEREAS, the Planning Commission held a duly called public hearing on March 17, 2011 when a staff report and public testimony regarding the rezoning and development plan were received;. and WHEREAS, the Planning Commission considered the Planned Unit Development request in light of all testimony received, the guidelines for evaluating rezonmgs contained in Section 35-208 of the City's Zoning Ordinance, the provisions of the Planned Unit Development ordinance contained in Section 35-355 of the City's Zoning Ordinance and the City's Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2011-006 submitted by Todd Shaw for Prevision Machine, Inc. be approved based upon the following considerations: The Planned Unit Development is compatible with the standards, purposes and intent of the Planned Unit Development section of the City's Zoning Ordinance. 2. The Planned Unit Development proposal will allow for the utilization of the land in question in a manner which is compatible with, complimentary to and of comparable intensity . to adjacent land uses as well as those permitted on surrounding land. 3. The utilization of the property as proposed under the Planned Unit Development Rezoning is considered a reasonable use of the property and will conform with ordinance standards except for the parking setback along James Avenue. . These modifications from the I-1 standards are justified on the basis of the development being an appropriate renovation and industrial use for this area and that they are offset or mitigated by the public safety improvements of the closure of the Freeway Boulevard access and installation of rain gardens in the remaining boulevard of James Ave. 4. The Planned Unit Development proposal is considered consistent with the recommendations of the City's Comprehensive Plan for this area of the city. 5. The Planned Unit Development proposal appears to be a good long range use of the existing land and this development can be considered an asset to the community. 6. Based upon the above considerations, it is believed that the guidelines for evaluating rezonings as contained in Section 35-208 of the City's Zoning Ordinance are met and the proposal is, therefore, in the best interest of the community. BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2011-006 be approved subject to the following conditions and considerations: 1. Execution of a PUD development agreement as prepared by the City Attorney. 2. Approval of a grading and planting plan for the rain gardens by the City Engineer. 3. Closure of the driveway entrance unto Freeway Boulevard and approval of a driveway permit for the James Avenue. 7 /7'-1t Date Chair The motion for the adoption of the foregoing resolution was duly seconded by member Parks and upon vote being taken thereon, the following voted in favor thereof: Chair Rahn, Commissioners Kuykendall, Leino, Morey, Parks, and Schonning. and the following voted against the same: whereupon said resolution was declared duly passed and adopted. 2 Member Tim Roche introduced the following resolution and moved its adoption: RESOLUTION NO. 2011-52 RESOLUTION REGARDING THE DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2011-006 SUBMITTED BY TODD SHAW FOR PRECISION MACHINE, INC. (1700 FREEWAY BOULEVARD) WHEREAS, Planning Commission Application No. 2011-006 submitted by Todd Shaw for Precision Machine, Inc. proposes rezoning from I-1 (Industrial Park) to PUD/I-1.(Planned Unit Development/Industrial Park) of a 2.77 acre lot; and WHEREAS, the proposal comprehends the rezoning of the above mentioned property and renovation and repurposing of a 45,000 sq. ft. industrial/warehouse building and expansion of its parking lot; and WHEREAS, the Planning Commission held a duly called public.hearing on March 17, 2011, when a staff .report and public testimony regarding. the rezoning and development plan were .received -,'and WHEREAS, the Planning Commission recommended approval of Application No. 2011-006 by adopting Planning Commission Resolution No. 2011-03 on March 17, 2011; and WHEREAS, the City Council considered Application No. 2011-006 at its March 28, 2011, meeting; and WHEREAS, the City Council considered the Planned Unit Development -request in light of all testimony received, the guidelines for evaluating rezonings contained in Section 35-208 of the City's Zoning Ordinance, the provisions of the Planned Unit Development ordinance contained in Section 35-355 of.the City's Zoning Ordinance and the City's Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED by the. City Council of the City of Brooklyn Center, Minnesota, that Application No. 2011-006 submitted by Todd Shaw, for Precision Machine, Inc be approved based upon the following considerations: 1. The Planned Unit Development is compatible with the standards, purposes and intent of the Planned Unit Development section of the City's Zoning Ordinance. 2. The Planned Unit Development proposal will allow for the utilization of the land in question in a manner which is compatible with, complimentary to and of comparable intensity to adjacent land uses as well as those permitted on surrounding land. 3. The utilization of the property as proposed under the Planned Unit Development Rezoning is considered a reasonable use of the property and will conform with ordinance standards except for the parking setback along James Avenue. These modifications from the I-1 standards are justified on the basis of the development being an appropriate renovation and industrial use for this area and that they are offset or RESOLUTION NO. 201.1-52 mitigated by the public safety improvements of the closure of the Freeway Boulevard access and installation of rain gardens in the remaining boulevard of James Ave. 4. The Planned Unit Development proposal is considered consistent with the recommendations of the City's Comprehensive Plan for this area of the city. 5. The Planned Unit Development proposal appears to be a good long range use of the existing land and this development can be considered an asset to the community.. 6. Based upon the above considerations, it is believed that the guidelines for evaluating rezonings as contained in Section 3 5-208 of the City's Zoning Ordinance are met and the proposal is, therefore, in the best interest of the community. BE IT FURTHER RESOLVED by the City Council of the City of Brooklyn Center that Application No. 2011-006 be approved subject to the following. conditions and considerations: 1. Execution of a PUD development agreement as prepared by the City Attorney. 2. Approval of a grading and planting plan for the rain gardens by the City Engineer. . 3. Closure of the driveway entrance unto Freeway Boulevard and approval of a driveway permit for the James Avenue. BE IT FURTHER RESOLVED by the City Council of the City of Brooklyn Center that staff is directed to proceed with an ordinance amending Chapter 35 of the City's, Zoning Ordinance Regarding the Zoning Classification of Certain Land Lot 1, Block 1, Interchange Addition, (1700 Freeway Boulevard). March 28 2011 Date ATTEST: City Clerk The motion for the adoption of the foregoing resolution was duly seconded.by member. Carol Kleven and upon, vote. being taken thereon, the following voted in favor thereof: Tim Willson, Carol Kleven, Tim Roche, and Dan Ryan; and the following voted against the same: none; whereupon said resolution was declared duly passed and adopted. COUNCIL ITEM MEMORANDUM DATE: March 28, 2011 TO: Curt Boganey, City Manager FROM: Gary Eitel, Director of Business and Development ,� re SUBJECT: Planning Commission Application No. 2011-006 (Request for PUD Amendment approval to Rezone 1700 Freeway Boulevard from I-1 (Industrial) to PUD/I-1 (Planned Unit Development/Industrial) to Facilitate an Expansion of the Parking Lot and Repurposing of this Industrial Building from Warehousing to Manufacturing Recommendation: It is recommended that the City Council, following consideration of this matter, approve the Resolution Regarding the disposition of Planning Commission Application No. 2011-006 Submitted by Todd Shaw for Precision Machine, Inc. (1700 Freeway Boulevard). Background: On January 27, 2011, the Planning Commission considered the potential relocation of an existing Brooklyn Center manufacturing use into the vacant industrial building at 1700 Freeway Boulevard and the possible use of the Planned Unit Development ordinance to establish flexibility in allowing the expansion of the existing one-way angled parking (accessed from Freeway Boulevard) to a double sided parking lot with a relocation of the driveway unto James Avenue. The discussion at that time included considerations to preserving the existing boulevard trees and the possible use of parking lot materials that would not increase the rate of storm water runoff. On February 17, 2011, the Planning Commission unanimously moved to recommend conceptual approval which allowed an expansion of the parking lot that encroached upon the standard 15 foot front yard setback with the use of rain gardens within the James Avenue North/ boulevard to address storm water runoff. On March 17, 2011, the Planning Commission conducted a public hearing on Planning Commission Application No. 2011-006 submitted by Todd Shaw for Precision Machine, Inc. a request for PUD Amendment approval to rezone 1700 Freeway Boulevard from I-1 (Industrial) to PUD/I-1 (Planned Unit Development/Industrial) to Facilitate an Expansion of the Parking Lot and Repurposing of this Industrial Building from Warehousing to Manufacturing. At the public hearing, the applicant informed the Planning Commission that Precision Machine, Inc. has been a Brooklyn Center business since the 1950's. They presently lease approximately 20,000 sq. ft. within the multi -tenant industrial building at 1800 Freeway Boulevard and operate two shifts with approximately 100 employees. The growth of the company requires an expansion of their facilities and the opportunity to acquire and repurpose the 45,000 sq. ft. office/warehouse building at 1700 Freeway Boulevard, Dlissiou: Ensuring an attractive, clean, safe c'ol)Jlltlllf(ty that enhances the grr«lity of life andpreserves the public trust COUNCIL ITEM MEMORANDUM enables Precision Machine, Inc. to accomplish their business plan and desire to stay and grow within the City of Brooklyn Center. Attached for your review are copies of the Planning Commission Information Sheet for Application No. 2011-006, an area location map and the Planning Commission minutes. Budget Issues: There are no budget issues to consider. Council Goals: Strategic: 2. We will aggressively proceed with implementation of City's redevelopment plans Ongoing: 2. We will ensure the financial stability of the City Mission: Ensuring an attractive, clean, safe conununity that enhances the quality of life and preserves Are public trust PLANNING COMMISSION AGENDA CITY'OF BROOKLYN CENTER MARCH 17, 2011 STUDY SESSION 1. Call to Order: 7:00 p.m. 2. Roll Call 3. Approval of Minutes — March 10, 2011 4. Chairperson's Explanation The Planning Commission is an advisory body. One of the Commission's functions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. 5. Todd Shaw for Precision Machine, Inc. 2011-006 Planned Unit Development Approval to rezone 1700 Freeway Boulevard from I-1 (Industrial) to PUD/I-1 (Planned Unit Development/Industrial) 6. Loren Van Der Slik 2011-004 Preliminary Plat Approval of Shingle Creek Crossing, the replat of Brookdale properties into four lots and two outlots to facilitate Phase I of the Shingle Creek Crossing PUD. 7. Resolution of the Brooklyn Center Planning and Zoning Commission Concerning Certain Redevelopment Project Area and Tax Increment Financing Proposals of the City of Brooklyn Center Brooklyn Center and the Economic Development Authority Development Authority in and For the City of Brooklyn Center. 8. Other Business: a. Presentation by the Gatlin Development Company. Design Team and review of the Shingle Creek Architectural Guidelines and Standards. b. Presentation by- the Gatlin Development Company Design Team and review of the Phase I internal streetscaping and lighting for the Shingle Creek Crossing PUD. 9. Continued Discussion Items: Review of the 2011 Community Development and Planning Activities. Continued review of Council Goals and the 2010 Planning Commission agendas in preparation for the April 6th Joint Council/Commission meeting. Educational opportunities offered through the Government Training Seminar. Your Role as Planning Commission Member 10. Other Business Article from Urbanland — `The Future of the StripT 11. Adj ournment Application Filed on 2-18-10 City Council Action Should Be Taken By 4-19-10 (60 Days) Planning Commission Information Sheet Application No. 2011-006 Applicant: Todd Shaw on behalf of Precision Incorporated Location: Northeast Quadrant of Freeway Boulevard and James Avenue North (1700 Freeway Boulevard) Request: Rezoning Approval to Establish a PUD to Facilitate an Expansion of the Parking Lot and Repurposing of this Industrial Building from Warehousing to Manufacturing The applicant, Todd Shaw, on behalf of Precision, Inc. is seeking to rezone Lot 1, Block 1, Interchange Addition, from I-1 to PUD/I-1 as part of the redevelopment/renovation plans for this existing 45,000 sq. ft. industrial building and expansion of its parking lot. BACKGROUND INFORMATION On January 27, 2011, the Planning Commission considered the potential relocation of an existing Brooklyn Center manufacturing use into the vacant industrial building at 1700 Freeway Boulevard and the possible use of the Planned Unit Development ordinance to establish flexibility in allowing the expansion of the existing one-way angled parking (accessed from Freeway Boulevard) to a double sided parking lot with a relocation of the driveway unto James Avenue. The discussion at that time included considerations to preserving the existing boulevard trees and the possible use of parking lot materials that would not increase the rate of storm water runoff. On February 17, 2011, the Planning Commission unanimously moved to recommend conceptual approval which allowed an expansion of the parking lot that encroached upon the standard 15 foot front yard setback with the use of rain gardens within the James Avenue North/ boulevard to address storm water runoff. ZONING This site is zoned I-1 (Industrial Park) and is indentiiied on the City's Comprehensive Plan as part of the City's 694 industrial area. This 2.77 acre site was developed in 1969 as part of an industrial development, known as Freeway Commerce Center. PLANNED UNIT DEVELOPMENT PROVISIONS/ STANDARDS Section 35-355 of the Zoning Ordinance provides for Planned Unit Developments (PUD) to promote flexibility in land development and redevelopment, preserve aesthetically significant and environmentally sensitive site features, conserves energy and ensures a high quality of design. 3-17-11 Page 1 The proposed use of a PUD allows the use of perimeter setback standards to provide green and open space from the existing neighborhood, flexibility in the location of interior lot lines, parking and structured parking setbacks, and the ability to deviate from the dedication of the standard side yard drainage and utility easements. The following minimum I-1 development standard is being requested to be modified to facilitate the expansion of the parking lot: Parking setback from James Avenue North —15 ft. to approximately 6 ft. The parking ratio used is for industry and wholesale buildings and is one space for each two employees on a major shift or one per 800 sq. ft. of gross building area, whichever is greater. The ordinance requirement for this building is 56 parking stalls. PUD APPLICATION AND REVIEW PROCESS The PUD provisions require that a development include sufficient information and details which allows the evaluation of the plans to address the following criteria: 1. Compatibility of the plan with the standards, purposes and intent of the PUD ordinances. 2. Consistency of the Plan with the goals and policies of the Comprehensive Plan. 3. The impact of the Plan on the neighborhood in which it is to be located. 4. The adequacy of internal site organization, uses, densities, circulation, parking facilities, public facilities, recreational areas, open spaces, buffering, and landscaping. Attached for you review is a copy of development plan/site plan which illustrates the proposed expansion of the parking lot and relocation of the Freeway Boulevard entrance driveway to James Avenue. The plan illustrates how a maximum of 123 parking stalls could be accommodated on the lot, assuming a conversion of a significant portion of the rear loading area is used for parking. Precision Incorporated is currently operating as a tenant in approximately 20,000 sq. ft. of the 1800 Freeway Boulevard industrial building. A meeting with the applicant indicates that they have been a Brooklyn Center business for approximately 50 years during which their Transformer Manufacturing business has grown to 100 employees and has approximately $20M in production. They currently operate two shifts and believe that their business is well positioned to more than double in the foreseeable future. The building at 1700 Freeway Boulevard is a 45,000 sq.ft. building and with the expanded parking will facilitate their needs and desire to stay and grow in the City of Brooklyn Center. 3-17-11 Page 2 RECOMMENDATION It is recommended that a motion be made to approve Planning Commission Application No. 2011-006 by adoption of Planning Commission Resolution No. 2011-03 subject to the following conditions: 1. Execution of a PUD development agreement as prepared by the City Attorney. 2. Approval of a grading and planting plan for the rain gardens by the City Engineer. 3. Closure of the driveway entrance unto Freeway Boulevard and approval of a driveway permit for the James Ave. 3-17-11 Page 3 67TH AVE N I MOO 6415 6445 17f34 AIs9c•eriSi1 N51�hci?.13.Cq�ig�rt{C}LO :k4 Gt52]]5 `+,� 1E01 S Gr25 22 lG a SM z rt w d y 8511 w d treat 97C1(t 1Cv33 FREEWAY BLVD 55TH AVE N 43 b3 o 8431 0 .. 0�4 Pd6.410 iupt M18 Mzt r+� iS Mfi C 6406 6407 r0, � p &165 84p1 Y 84THAVE N 18S31p w6ft � 53+12 ii343 & 633 -38 Planning Commission Application No. 2011-006 O ICI 1"3 d A J lui s, R < J, list y JM:!: THE PINES NORll-i U-C .. .. ...... . ... ... DTMTMTI-F IAM,Hol iltl I I I I I I III I M7TFF-ras — 154� 01,-'MER; 5,,kNOVIC, INC. Z (0 T L 2— w_ \ I N X Tl� I 11 TIC ALI- . qT14-ttL �oco i i-= . . . ....... — — — — — — — — --- OWNER: NEAL A. BRASTAQ TRUSTEE i OWNER; ST.PAUL PROPERTIES INC. 'Z' NO, S 1+ 1329 oft Cul to — pm (AIM m -cp m psim OV.— OM AID FAAb om arts to PM&AFM PRECISION INC 1700 Freeway Blvd. Min I 1 1771711 --- ----------------- YO 0 16T tat. ftTP CF 3) OM MV CF 4) iANffHt 2f—FOJM W OF 41 Ef- OMMVCFV V6 T07AL FAWW, ITALLI] L BUILDW3 UMR MIDERAVOM noo FREmy BLVD. K" FREEWAY BLVP, NORTM (2) WE PLAN opolls, MN 55430 a 5 SITE / BUILDING INFORMATION SITE AF£A • 90,913 SF. (2.18 ALR£S) EUILMYs AREA = 4OA04 SF. WAER OCCUPIED • 33062 SR 60 LEASE • 1,442 OF. OMR OCCUPAXY • 33^2 6P. MWACTUM • 22026 Of. CH4M AND SI"M -1,036 SE KAMPA,C1UF1iYa la 1: ON SF) • 50 STALLS OFFICE AF'EA to 4, WO SF) . 65 STALLS FAW,M KaJFW • 16 STALLS FAW,M F' ADED . U6 STALLS (TYPICAL STALL U40M 15 V X 11'•6' I GYE@14'Yi) �1'4IIItE1l7lbtll" I' FORRW OI(pBl latiQt 1' &CYAU D WN TOF40C o_ FECOMOEDPLANTS: ,`},' •.`..+ ;r T •r•a . •. 'n• • MW AFM WAWA& 6IfypKALJ r,. t.JY,",�;i.`,> .1v RWC.YaBIR KA M MWrAV YIYMOASSW OL%MRDOI 6067 EFEAT 0MR&ATED KLMASE ectEEEt ware IRSrrwmm ware" D' DROWA MSHI W WOCK AEG uw AL!! UXDBI NtXA}DHt oOfEDf3lkbt�nUTOlt FPCOMETbED5F4a�5 * RFfI1T IXi7ELlrF1 TO wwcft 61bY YiIB 01K liQi7 YiElt MAOM STORM SUER MA44CLE KACK 00aMOV o" W1er1ICT<AtsaTFED ORCATLHEASN LONNxEYeRw yF L Or13iLA y\ — STORM FELLER K444OLE OR CATCH BASH rauG: FP4LfY. Lea tuiavt ]'ttW4NN W OGFORPlFM/ 4'IL04 FO MR36.ONRCC ' 4Yl.CN tG14KK %'OG FOR N9E6 4'CRWfIEfIINlMC O.LiM IMMW HAY NOI BE WaMN OBRAN LOGTKNS m Ab A044M TO FOOM A'" Rb I OR F n"fi. 2 TYPICAL RAIN GARDEN DETAIL A -I NOT TO WALE m q Member Kuykendall introduced the following resolution and moved its adoption: PLANNING COMMISSION RESOLUTION NO. 2011-03 RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2011-006 SUBMITTED BY TODD SHAW FOR PRECISION MACHINE, INC WHEREAS, Planning Commission Application No. 2011-006 submitted by Todd Shaw for Precision Machine, Inc. proposes rezoning from I-1 (Industrial Park) to PUD/I-1 (Planned Unit Development/Industrial Park) of a 2.77 acre lot; and WHEREAS, the proposal comprehends the rezoning of the above mentioned property and renovation and repurposing of a 45,000 sq.ft. industrial/warehouse building and expansion of its parking lot; and WHEREAS, the Planning Commission held a duly called public hearing on March 17, 2011 when a staff report and public testimony regarding the rezoning and development plan were received; and WHEREAS, the Planning Commission considered the Planned Unit Development request in light of all testimony received, the guidelines for evaluating rezonings contained in Section 35-208 of the City's Zoning Ordinance, the provisions of the Planned Unit Development ordinance contained in Section 35-355 of the City's Zoning Ordinance and the City's Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2011-006 submitted by Todd Shaw for Prevision Machine, Inc. be approved based upon the following considerations: 1. The Planned Unit Development is compatible with the standards, purposes and intent of the Planned Unit Development section of the City's Zoning Ordinance. 2. The Planned Unit Development proposal will allow for the utilization of the land in question in a manner which is compatible with, complimentary to and of comparable intensity to adjacent land uses as well as those permitted on surrounding land. 3. The utilization of the property as proposed under the Planned Unit Development Rezoning is considered a reasonable use of the property and will conform with ordinance standards except for the parking setback along James Avenue. These modifications from the I-1 standards are justified on the basis of the development being an appropriate renovation and industrial use for this area and that they are 1 offset or mitigated by the public safety improvements of the closure of the Freeway Boulevard access and installation of rain gardens in the remaining boulevard of James Ave. 4. The Planned Unit Development proposal is considered consistent with the recommendations of the City's Comprehensive Plan for this area of the city. 5. The Planned Unit Development proposal appears to be a good long range use of the existing land and this development can be considered an asset to the community. 6. Based upon the above considerations, it is believed that the guidelines for evaluating rezonings as contained in Section 35-208 of the City's Zoning Ordinance are met and the proposal is, therefore, in the best interest of the community. BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2011-006 be approved subject to the following conditions and considerations: 1. Execution of a PUD development agreement as prepared by the City Attorney. 2. Approval of a grading and planting plan for the rain gardens by the City Engineer. 3. Closure of the driveway entrance unto Freeway Boulevard and approval of a driveway permit for the James Avenue. Date ATTEST: , Secretary Chair The motion for the adoption of the foregoing resolution was duly seconded by member Parks and upon vote being taken thereon, the following voted in favor thereof: Chair Rahn, Commissioners Kuykendall, Leino, Morey, Parks, and Schonning. and the following voted against the same: whereupon said resolution was declared duly passed and adopted. F) FILE COPTanningCommission City of JTB,-rooHyv Cewer— www cityofbrooklyncenter. org 6301 Shingle Creek Parkway, Brooklyn Center, Minnesota 55430-2199 Phone 763.569.3300 TTY/Voice 711 Fax 763.569.3494 March 21, 2011 Precision Machine, Inc. Todd Shaw 1800 Freewasy Blvd Brooklyn Center, MN 55430 Dear Mr. Shaw: Please be advised that the City Council of the City of Brooklyn Center will review Planning Commission Application No. 2011-006 submitted for, Planned Unit Development Amendment at its meeting on Monday, March 28, 2011 in the City Hall Council Chambers, 6301 Shingle Creek Parkway. This City Council Meeting begins at 7:00 p.m. and this matter will be considered as soon thereafter as the City Council's agenda will permit. The applicant or a designated representative must be present at this meeting. Auxiliary aids for persons with disabilities are available upon request at least 96 hours in advance. Please contact the City Clerk at 763-569-3300 to make arrangements. If you have questions or comments regarding this matter, please contact me. Sincerely, Tim Benetti Planning Commission Secretary P- I LE veav 1 91' City of Planning Commission ,T-B.,-roojUyn Center—L—www.cityofbrooklyncenter.org .............. _..... 6301 Shingle Creek Parkway, Brooklyn Center, Minnesota 55430-2199 Phone 763.569,3300 T"TYNoice 711 Fax 763.569.3494 March 9, 2011 Todd Shaw 1800 Freeway Blvd Brooklyn Center, MN 55430 Dear Mr. Shaw, Please be advised that the Planning Commission of the City of Brooklyn Center will review Planning Commission Application No. 2011-006, submitted for a Planned Unit Development Amendment, at its meeting on Thursday, March 17, 2011 at approximately 7:00 p.m. in the City Hall Council Chambers, 6301 Shingle Creek Parkway. The applicant or a designated representative must be present at this meeting. Auxiliary aids for persons with disabilities are available upon request at least 96 hours in advance. Please contact the City Clerk at 763-569-3300 to make arrangements. If you have questions or comments regarding this matter, please contact me. Sincerely, Tim Benetti Planning Commission Secretary NOTICE OF PUBLIC HEARING TO WHOM IT MAY CONCERN: Please take notice that the Planning Commission of the City of Brooklyn Center will hold a public hearing on Thursday March 17, 2011 at approximately 7:00 p.m., at the City Hall, 6301 Shingle Creek Parkway to consider the petition described below: TYPE OF REQUEST: Planned Unit Development Amendment PETITIONER: Todd Shaw (for Precision, Inc.) PROPERTY NAMED IN THE PETITION: 1700 Freeway Boulevard Legal Description: Lot 1, Block 1, Interchange Addition, Hennepin County, Minnesota BRIEF STATEMENT OF CONTENTS OF PETITION: Said proposed Planned Unit Development Amendment has been submitted by Todd Shaw on behalf of Precision Incorporated and includes an expansion of the existing parking lot and relocation of its driveway entrance at 1700 Freeway Boulevard. Auxiliary aids for persons with disabilities are available upon request at least 96 hours in advance. Please contact the City Clerk at 763-569-3300 to make arrangements. Respectfully, Gary J. Eitel Planning Commission Secretary CITY OF BROOKLYN CENTER FIL F Copy PLANNING COMMISSION 6301 Shingle Creek Parkway 763-569-3305 NOTICE OF PUBLIC HEARING TO WHOM IT MAY CONCERN: Please take notice that the Planning Commission of the City of Brooklyn Center will hold a public hearing on Thursday, March 17, 2011 at approximately 7:00 p.m., at the City Hall, 6301 Shingle Creek Parkway to consider the petition described below: TYPE OF REQUEST: Planned Unit Development (PUD/I-1) PETITIONER: Joseph Antonucci, Landmark Partners, PROPERTY NAMED IN THE PETITION: 1700 Freeway Boulevard BRIEF STATEMENT OF CONTENTS OF PETITION: Said proposed Planned Unit Development Amendment has been submitted by Landmark Partners, Inc. on behalf of Precision Incorporated and includes an expansion of the existing parking lot and relocation of its driveway entrance at 1700 Freeway Boulevard. Auxiliary aids for persons with disabilities are available upon request at least 96 hours in advance. Please contact the City Clerk at 763-569-3300 to make arrangements. Respectfully, Gary J. Eitel Planning Commission Secretary 3!7 INFORMATIONAL NOTICE CITY OF BROOKLYN CENTER CITY COUNCIL 6301 Shingle Creek Parkway 763-569-3300 TO WHOM IT MAY CONCERN: Please take notice that the City Council of the City of Brooklyn Center at its meeting on Monday, March 28, 2011 will consider the petition described below. The meeting will begin at 7:00 p.m. in the City Hall Council Chambers, 6301 Shingle Creek Parkway. A definite time for this petition to be considered cannot be given as it will depend on the progression of the agenda items. TYPE OF REQUEST: Planned Unit Developmebt PETITIONER: Todd Shaw (For Precision Machine, Inc.) PROPERTY NAMED IN THE PETITION: 1700 Freeway Blvd Legal Description: Lot 1, Block 1, Interchange Addition, Hennepin County, Minnesota BRIEF STATEMENT OF CONTENTS OF PETITION: Said proposed Planned Unit Development Amendment has been submitted by Todd Shaw on behalf of Precision Machine, Inc. and includes an expansion of the existing parking lot and relocation of its driveway entrance at 1700 Freeway Boulevard. Auxiliary aids for persons with disabilities are available upon request at least 96 hours in advance. Please contact the City Clerk at 763-569-3300 to make arrangements. Respectfully, Tim Benetti Planning Commission Secretary 3511921140003 3511921140007 3511921140008 JAMES AVENUE PARTNERS LLC NEIL A BRASTAD TRUSTEE ST PAUL PROPERTIES 6530JAMES AVF N 6437 MCCAULEY TERRACE 385 WASHINGTON STREET BROOKLYN CENTER MN 55430 EDINA MN 55437 ST PAUL MN 55102 3511921140009 3511921140010 3511921140010 THE PINES NORTH LLC ASSAAD Y HARK MARCELLINO Y HARK 7800 METRO PARKWAY # 200 417 MAIN ST NE ELIAS YAZABEK MINNEAPOLIS MN 55425 MINNEAPOLIS MN 55413 417 MAIN ST NE MINNEAPOLIS MN 55413 3511921140016 3511921140017 3511921410008 LONG RIDGE INDUSTRIAL PORTFOLIO LP SANDVIK INC ISTAR BOWLING CENTERS II C/O THOMPSON PROF & REG. ATTN: ACCOUNTS PAYABLE 1114 AVE OF THE AMERICAS PO 4900 510 GRIFFIN RD NEW YORK NY 10036 SCOTTSDALE AZ 85261-4900 WEST BRANCH MI 48661 3511921410014 3511921410015 3511921410020 LALIVANH PHOMMAHAXAY HERITAGE INN OF BRKLYN CTR PH MINNEAPOLIS LLC KAYKHAM PHOMMAHAXAY C/O THARALDSON ENTERPRISES THE MOLASKY GROUP COMPANIES 1601 FREEWAY BLVD PO BOX 9118 ATTN: VP/CFO BROOKLYN CENTER MN 55430 FARGO NO 58106 100 N CITY PKWY #1700 LAS VEGAS NV 89106 3511921420006 SARAH HOSPITALITY INC 11643 FERGUS ST NE BLAINE MN 55449 O ty of Planning Commission JT� l oo.Myj Cej a twww.cityojbrooklyncenter.org 6301 Shingle Creek Parkway, Brooklyn Center, Minnesota 55430-2199 Phone 763.569.3300 TTY/Voice 711 Fax 763.569.3494 February 24, 2011 Mr. Todd Shaw 1800 Freeway Blvd Brooklyn Center, MN 55430 RE: Planning Commission Application 1700 Freeway Blvd Dear Todd: Enclosed is a receipt for payment received for $1800.00 for a Planning Commission Application for a PUD Amendment for the property located at 1700 Freeway Boulevard. Your application is scheduled for the March 17, 2011 Planning Commission meeting. Sincerely, Rebecca Crass Administrative Assistant D FREEWAY E3LYp, A-' �� WII m The Design Partnership, Ltd. OIII tlaMPbu v 0—)d11dJ16 "�°"'.• "u `PRECISION INC. I700 FREEWAY BIVD fioOBPLW ap"`d,,.,"0Q`' m. uN.umxm�i q°. c11Meh MvvapoY,AQ166tl1 6m0 611MOW MOMYN PAFKM PLYMOUTH ZONING ORDINANCE Front Lot Llcte K L Side Lot Une ---�� o • IE � K . G M PARKING .LOT DIAGRAM�. i0e5 (Amended by Ord. No. 2001-06, 02113101) 21135-6 PLYMOUTH ZONING ORDINANCE Dimension Diagram 450 600 750 90° Stall width parallel to aisle* A 12.7 10A 9.3 9.0 Stall length of line B 25.0 22.0 20.0 18.5 Stall depth C 17.5 i'9,0 ` 19.5 18.5 Aisle width between stall lines D 12,0 16-W 23.0 26.0 Stall depth, interlock E 15.3 17.5 18.8 18.5 Module, edge of pavement to interlock F 44.8 52.5 61.3 63.0 Module, interlocking G 42.6 51.0 61.0 63.0 Module, interlock to curb face H 42.8 50.2 58,8 60.5 Bumper overhang (typical) I 2,0 23 ' 2.5 2.5 Offset J 6.3 2.7 0.5 0.0 Front yard setback of parking to lot line K** R Districts- Residence Uses (except 1 & 2 Family) 30 R Districts- Non Residential Uses 20 Commercial and P/1 'Districts 20 Industrial Districts 50 Adult Correctional Facilities 200 Side and rear yard setback of parking to lot line K** R Districts- Residence Uses (except 1 & 2 Family) 10 R Districts-1 & 2 Family 3 * * * R Districts- Non Residential Uses 30 Commercial and P/I Districts 20 Industrial Districts 20 Adult Correctional Facilities 400 Cross aisle, one-way L 14.0 14.0 14.0 14.0 Cross aisle, two-way - - 24.0 24.0 24.0 24,0 Front lot line to drive (landscape area) M R Districts - Residential Uses 10.0 R Districts - Non Residential Uses 30.0 Commercial and P/I Districts 10.0 Industrial Districts 25.0 Side and rear lot line to drive N R Districts - 1&2 Family Dwellings (landscape area) 3.0**** R Districts - Other Residential Uses 10 R Districts - Non Residential Uses 30.0 Non -Residential Uses 15.0 Parallel parking, stall width -- 910 Parallel parking, stall length - 23.0 Parking or drive aisle setback to principal structure 0 All Districts 10.0***** Minimum inside turning radius for fire lanes - All Districts - As required to comply with minimum turning radii for fire a aratus e ui ment * Required handicap stalls and ramps shall be per State Code, ** Joint or combined parking facilities on separate lots as authorized and when constructed adjacent to a common lot line separating two (2) or more parking areas are not required to observe the parking area setback from such common lot line. *** Except that parking shall not occur within any established drainage or utility easement - refer to Section 21135.08, Subd, 5, **** Except that the setback for lots with frontage on cul-de-sac turnarounds may be less than 3 feet for that portion of the lot located within 15 feet of such cul-de-sac turnaround. ***** Except that entry vestibules containing less than 120 square feet may encroach up to seven (7) feet into this setback, provided there are no exit doors on the vestibule wall that directly faces toward the parking area, 21135-7 A-1 M ,; The Design Partnership, Ltd, loilll ff I1.. dlolaebAll O 612MOVA A4r>�eY, k8166101 6m0 blia9 km °a"N PRECISION INC. aoorsau+ IMIM EWAVBWD BROdQYN PAPoC NN y r -----�--->'a� v-------- a \\ 6 I V AA -l-1 —wWw 4- w w w�w�--w w w w w�--w w w w w w w w w- O \ \ nut via via—... , --;—v't'—=----w O 'GAIG .kVM33W 30 Oti•' lLZ �3 Li 6C.62 N 0 o `\,' A- --- 3Nn .IVM d0 1H9121-� �� o OV02! 3 fF \\ co o r v�i n SS300V �, 3 - -- --wsr p'Ol L ZZ L'. 69 I 3 z� � 1 � 4J " 0 w 6 8L o U > A W U IIi ; / C o l- I� i I i O - - - ((D Lj I ��1d I o I III_ n` O i I 3N Y S w N to N Zz I �Tloo I Ia UMW h.N I O I IJ 1 I -MO - z ' / �,mr3.U����• oWzm�//u• Ww II_Ln IwjIw II ° O�NQQ 1n ,. m Z iIii I( om�sssc l-:O.. LJn-Li,mW w Ul aU.(n oz, LJ U Q Lo WUzw N o o Iiq >z ul M m w 0 ' Lj 00 It IV, - W m ZD / ~o ( Z ( /0LO � o� I, Uu I M-�� �� --0e W �I �m�__'' --I I o I� I z A / U II ZN. ... Il o ¢ 3I_ 2 I m ( aN 13 I-- 00'04 J QCD N II w �\\ J I I CK s O'69Tf'ZZl -�3 > 3 P---- _ L I0 .. ...... N o � 0l- -% � I m o � 1 NiLq Livl �Nl N 04 d N \ S JjS IN V / I I\ 3 — —� — — 0.69 �\ �Q-- —w— -'— w—..—w—rrri /w 1 v \ \\ -_ I I V1 A ( 1 I )(I I n / / J " F� f LO z m 0 _ w w w w —�I j' ¢i .Ol.'W. 11 j {1 err --ate- -I CI ._� £ I CA, � Tim Benetti From: Gary Eitel Sent: Tuesday, June 28, 2011 12:41 PM To: Tim Benetti Subject: FW: Precision Site Plan Tim, Could you coordinate this with Public Works and get back to Darrell. Thanks Gary From: Darrell D Anderson[maIIto: danderson@tdparch itects.com] Sent: Tuesday, June 28, 2011 11:55 AM To: Gary Eitel Subject: Precision Site Plan Gary Haven't spoke to you in some time, hope all is well with you. We have had several meetings at the Precision Project an were wondering if we could change the set back from the property line to the curb from 5'-10" to 5'-0" and use the 10" at the building wall where we have the side walk. This would help a great deal with the car over hang and allow the walk to be used. If you or your planners have issue with this please let me know. Thanks for your consideration. Darrell D. Anderson AIA, NCARB The Design Partnership, Ltd. 111 3rd Ave South - Suite 150 Minneapolis, MN 55401 612-338-8889 PRECISION INCORPORATED 1700 Freeway Blvd. Minneapolis, MN 55430 FREEWAY BLVD. SITE / BUILDING INFORMATION SITE AREA • 110,S13 Sr. (2.18 ACRES) BUILDW3 40 = 40,504 SF. MR OCCIM°tED • W62 SF. 6M LEASE • 1,442 6F, 0QMR 0CCW4r Y • 3302 SF MWACTIM • 22026 of, MICE AW SUPPORT = 11,036 6F. KWACTUR% (a I : NO 6FJ • 50 STALLS OFFICE AREA (. 4 : M SF) • 65 STALLS PARK,M t EGURED • N5 STALLS PARK,M PR014DED -- 06 STALLS MOM STALL SHOUN 16 S' x n'-6' I OVERHANG) 6' 6C4RFED 6' BALYAIfE 6M tOPFCB RECatE DED PLANTS: OW AFEA& * NVOYAIM IE. EIYLNO ASTER CATERF"6EVA RAW K466" VWWA Km" OLM6 ROOT E WN9 EERI mew W damABWvER REC4P8'MD SEARS, N47DYAlWaM 6WOR Y dF£Ab tEAOW 91ff7 EVIXOOKEBOW WAI um CRA'YEWif REDOM D0O= LO®aRkNFY,Mt aou F a6Y natou 6'-0'T4U7 .TN _ FORRMURR WnGM COARSE FLIER AWfr4ATE O}LDOT 6FEa3MUO J1000W Df10..L A'O QW CR FWA6T CONEC" TO 610fdt EdER —.1 R1 SEDER M4%aE OR CATCH BASF! aA L omaL� 3A — STORM SEDER MANHOLE OR CATCH BASH SIBY. ASPAM, 18 V NAm" Y PUIft�TDi 4'=rM 61Aa6 4' POTS, ED124' 0G rCR NRE6 OALLCN POTS, MR 36' O0. KR $90 4' DRAME NN—M * OrDnW SIRIG M HAYNOt 9E FE!WEDN CERTAN LOCAMNS M AS ADYLENT TO MOM AMA "AO¢ 6EnA10& g�9 caz�� SrE$� �c`doo '=mES i'z a .2 fix t I..f� 0 g€ L I— yr~ii'y N TH SITE PLAN 2 TYPICAL RAIN GARDEN DETAIL A -I SCALE: i' . 30.0° A -I NOT TO 6CALE r a z 9.NZ go ax, LU a H aoa g•9 n $e3 5£'$S 3�'oSo LeES �4 CONCEPT'A' I) /N I _-N ITS-�) ►i\ ICI I�T�_)I A 3 s Di�\L/Ur�\L_�ILJ�J�% I I \i/-\L_ i a) 0 3 li) rl, 7� 13 D ,11 > ;0 I C7 F0 o I > > a S cn<- /I r17 O D � M-p M M- T1 ,I � �> m I� C_ M _ r1� z I V o II -i / DD z I I! I o - _- O rr 0 z - z --I A A T � I- I ML- ///// 65SONORTH ORYMCO CRETEAVENUEBUILDING 0 E 'a <1711 o W J f O > cam � rlA/NI[,-C). �_/ V V I VL_1 \. z ((A!) I A f, Ar_ A\ /r_-i\ 11 IF- i D A L)T^ Ir_-�)^ I I r\ O m ll/-\IVIL_.: /-\ V L_I VIJL_ i r-\I \ I 1 VL_I \.: L_L_u CA M S 89°39'37" W 272.27UM a R'C-- - - -mc- - - -- --_E [E] - - - 69.0 ? 3P RKN SA S o 7T N I BITUMINOUS O o o, I I iII n -10 -- - - ;- fir- 0 1 6 J -7 L - ...... C�) r S - - ----- --t- 122.3 71.7 I -- �69.0 _ I\\ 5.00 122.6 i I rI l \ f I G / F_ \ \ I = m / n m n m `. \ C I I r- \ \\ I I Om p /- Ln I 40.00 --►I Ir �' F O T L N I zm r I � � � o �� ( mD G r I� I o T 0. 3 4 J ccn l S � >r <m r l (I II / n I0 II II z II I -L7 �10.00 � a c -50 1 r -I � �- F s I W� I I I M U� U 1 c� cn , Z r- O1 ( CC�D N n I O�'(� ' O, o o n m U) G ,, o 01 CA z f i N z M CWi r- I>p`� I ri I r ( U)I U)cn DOD �... '7 m I r\ C_ 1 �; E W ,U'Z D I D 1 I I (n ` rn r L - G I I >,� OJ , J I m i I I G f l \ y'Z7 co C_ = I I - I - i 0 m _ CD/ Fri o' C In I I I -117E 01 G � , I I I ,00 cf)o -L7mF_ oO 060' ROW - 00 O I �� I( o o o z 1 it I z l00 V) I I r11 d t I F -F 1 I - s c I I M / i CD o vim 1 1 I > �_ W I -1 m rr1 rn , i I w / U, �� G -10 > d _ _ _ m v s II z - W o � o m o �' � m / G I 78.9 z 122.5 __ 0 69. � 122'7 z -z� ' ' z ----- 1 i I I �� 10.00n n C E I m 1 i I rTt z ��� f -r1\`\ � > 1 / ROAD m i D ,' c> r- (n ACCESS o cn o \ G' cn > r � n o v II G I I o o / r iTt \\ O cn v M> s I !o cno ROADP i �n - �� \\ 1 �_-_ -- O D cn \ < \ ACCES \ , `\ 85.43 LM - - - - � .•._.mom-. Fne RIGHT OF WAY LINE \- `\ Al `\ -_o N 89*39'37" E 271.40 OF FREEWAY BLVD. \\ o\ v) £ 67 `\ \\ `\ `�\_ ->v >u >n >n >n - >n >n-`--T--\�\ na �na na na \ \ M M M M M -!1 M M M M-- M M M M ��-�M--��M M M M M M M M M M M M M M D r- -� r- r-1 A / A i �� /1 I I I r- , A . �> m ,\\ `\\ \\\ \\ < I L_ L_ V V n I L, LJ U L_ L_ V n I L) c `\ I Vril.ly i\I\7r1 \I\I rvn I- I )Ii�l I A )r��nN I r� A ; )I \` SURVEY PERFORMED BY: I- i-)�`\\ I N I /� 'I /) 7 7 \I�r�/-\I \L��UI �1 I / I \r \ I \ L_ I HARRY S. JOHNSON CO. INC. I `\��\ LAND SURVEYORS & CONSULTANTS �_ 11 DRAINAGE & UTILITY EASEMENT 9063 Lyndale Avenue South PER PLAT OF INTERCHANGE ADDITION Bloomington, Mn. 55420 (952) 884-5341 (952) 884-5344 Fax Email: tom@hsjsurveyors.com Web: www.hsjsurveyors.com GENERAL NOTES: 1. The bearing system used is based on the plat of Interchange Addition. 2. The location of the underground utilities shown hereon, if any, are approximate only. PURSUANT TO MSA 216D CONTACT GOPHER STATE ONE CALL AT (612) 454-0002 PRIOR TO ANY EXCAVATION. 3. Subject property is identified as being in "Zone X, Other Areas" on Flood Insurance Rate Map No., 27053CO208E, effective date September 2, 2004. 4. Zoning is presently 11 (Industrial Park) per City of Brooklyn Center planning department, 6301 Shingle Creek Parkway, Brooklyn Center, MN 55430. 5. Setback requirements per City of Brooklyn Center. Front = 50 feet, Rear = 25 feet, Side = 10, Side Adjoining street = 50 feet 5(b) Maximum height. No height restrictions. 5(c) Bulk restrictions. No bulk restrictions. 5(d) Parking restrictions based on building usage. Building usage is unknown to surveyor. Note: The zoning and setback information shown on this survey are per city's webpage, on January 25, 2011. No representation is made for the accuracy or completeness of said third party information. This firm is not an expert in the interpretation of complex zoning ordinances, compliance is beyond the scope of this survey. Any user of said information is urged to contact the local agency directly. 6. Site area = 120,968 square feet = 2.777 acres. 7. There are a total of 51 striped parking stalls on said property, of which there are 3 designated as handicap. 8. All field measurements matched recorded dimensions within the precision requirements of ALTA/ACSM specifications. 9. This survey was made on the ground and in accordance with the Minimum Standard Detail Requirements for Land Title Surveys as adopted by ALTA and ACSM. 10. There is no visible above ground evidence of earth moving work, building construction or building additions within recent months. 11. There is no observable evidence of recent street or sidewalk construction or repairs. 12. There is no visible above ground evidence of the site being used as a solid waste dump, sump or sanitary landfill. 13. There is no observable evidence of cemeteries in the field or of record. 14. All utilities serving the subject property enter and exit the subject property through public rights of way or through easements specifically dedicated to each utilitys use. 15. The 'Property as described is internally contiguous and contains no gaps or gores. 40 20 0 40 80 120 SCALE IN FEET LEGEND • Property Monument -W Overhead Electric - - - Overhead Telephone - - -�- Storm Sewer H< Sanitary Sewer w W w Water Gas Fence ---BW Building Setback Line Gas Meter m Electric Transmission Box Catchbasin Catchbasin ® Sanitary Manhole m Telephone Manhole m Storm Manhole >k- Light Pole Gate Valve O Guard Post Concrete Concrete Curb • y Deciduous Tree (Diameter in Inches) VICINITY MAP 67TH A Y 0- WW U a _J � W z <W I- ��►ZriKi FREEWAY BLVD NOT TO SCALE CAD File: 2011111.DWG Path: J:\2011111\DWG\ GENERAL NOTES: 1. The bearing system used is based on the plat of Interchange Addition. 2. The location of the underground utilities shown hereon, if any, are approximate only. PURSUANT TO MSA 216D CONTACT GOPHER STATE ONE CALL AT (612) 454-0002 PRIOR TO ANY EXCAVATION. N n 3. Subject property is identified as being in "Zone X, Other Areas" on N V Flood Insurance Rate Map No., 27053CO208E, effective date September i Jo X 1600 FREEWAY B`VD. 2, 2004. WZ \ 1-STORY CONCRETE BUILDING { { To �J FOOTPRINT AREA = 40,732 S.F. 4. Site area = 120,968 square feet = 2.777 acres. I - ao \ � X � a_ c . 5. There are a total of 51 striped parking stalls on said property, of \ 1 3 00 which there are 3 designated as handicap. w I o w un V) r_______________________- PP5 FOOT ELECTRIC Ll E6. Ti11S SUrVey WaS made On the grOUnd. EASEMENER DOC. N0. 423 314 �� AS Ln co cc 7. No current title work was furnished for the preparation of this CIO;' o ��\�. I i - LE .-J4 survey, legal description, recorded or unrecorded easements and CC �� I ^ w ,s%� %� � encumbrances are subject to revision upon receipt of current title { m ,;%' '� _ - 332. 5 R _ I 843 2G work. X I X ' �� i-'%'' . N ' o - _ - �., -mom== ,42.91 CV Z fit- 7 D 8. Elevation datum is based on NAVD 88 data. E - _�- 4� _ J;sT(TEF 72.50 °�h°c ��' / _�-- ELEC. TRANSFORMER - �- HSJBenchmark #1 is located Top of Nall (AS SHOWN ON SURVEY) 74.50 oo , _ _ o d ' Elevation = 845.47 { 11 NXo•, �,a�3' CONCRETE STEPS CONCRETE STEPS STES CONCRETE STEPS II � t��� 9. Proposed rain gardens locations and drivewaysalongJames Avenue I °� Co 42.g �2. Lo �� I rx`L 25 �, ADVEKII I SI N G North have both gas and electrical Imes running through them. The �� a0E - - 1 - o �, depth of these utilities is unknown. Call "Gopher State One Call" to X ' o / o I ���' ICUD X ! I o I �h. I I V I0 �' / rn � � I ! have lines marked prior to construction and use caution in these ��` �X � ,o r L6 � \ areas. 11 ��' S O /_ �- O�. . oo _ I� LEGEND • Property Monument ........... ....... Concrete Concrete Curb -x Fence -W Overhead Electric ---�W Underground Electric ---�� Underground Telephone w w w Water - �- Gas Sanitary Sewer - -N� Storm Sewer p Electric Box 0 Power Pole Hydrant ® Unknown Manhole • Gate Valve ® Catchbasin ® Catchbasin 16 Deciduous Tree (Dia. in in.) Light Pole ® Gas Meter 6 Telephone Manhole ® Sanitary Manhole m Storm Manhole - - - -906- - - - Existing Contour X 851.27G Existing Spot Elevation Gutter X 934.3 Existing Spot Elevation 845 Proposed Contour X 45.0 (45.) Proposed Spot Elevation Gutter Proposed Drainage Arrow - t- - - - - Existing Drainage Arrow T/C Top of Curb 00 Q I o o N 0'13' 38" W 5.01 13 ACCESS EASEI�E`AI� ' - o FF2 �, _ „� P DOC. No. 4232314 � ! 1 8 N A - � 24.09 �I C)o - -- : -- - FA / ��� X� X -1 _ i - / s �� 88.09 �s!_-______---- -- - �/ - i 133.50 i I T 00 367�O X - o'er` V ' SZ � ��`--------- 13. 10 FOOT STORM SEWER i � ,,' u �. X �� i EASEMEXPtK ER DO�XNO. 4232314 --r { E I I '"" I 11. DRAINAGE & UTILITY E EMENT _ %' 9�1 I s SlV HSJ BENCHMARK #2 ,, TOP OF NAIL ��. �� I �Ti E PPLAT OF INTERCHANGE PDITION �/� '� I A 7) ELEV.=843.58 I �� �� i �� i f DX / �O / v G' . �� _ m \ m < ! ! i �� 0 W ? \! \ 51.50 i A v. _ �� L I w s c� , A ;E I a / ; `� _ FINISHED FLOOR ��X I I �L. 0 j �6 I I 11,\ 843. OG i I i X L J = �� � N\ � � � / � � � ELEV.-846.50 \ �tx � U i �- r� . { I ��I/ 24.0o I l n FINISHED FLOOR ,I _ J a. �� �� -� ` ELEV.=846.57 I - :� I I s - <c I -io / '�( ) 0 I I 1 S OR -IN � - -3 �!_JIN� FINISHED FLOOR � �� X`b I � I O �X � -__1 „ � �' FINISHED FLOOR�" - �, , ��� ELEV.=846.50 { / PP MATCH_ Do ELEV.=846.57 i � l �'N,' - �� =�`� `� �` r \ _ in t _ 11. DRAINAGE &UTILITY EASEMENT I ` W / VvG-- I W- � ---W I HSJ BENCHMARK 1 EXISTING CURB �� \` I I ► _ �__- i j �1 U 0 /- N :3 - TOP E NAIL # �T- �ER PLAT OF INTERCHANGE ADDITION i 1� FINISHED FLOOR FINISHED FLOOR , I ( I - / ELEV.=845.47 �- ELEV.=846.55 "� w < ELEV.=846.54 �' I CD 8� y ' , i FINISHED FLOOR � �� o= A , psi- ; I /.' i - i ! 4 EXISTING CURB_ `{ -g-, 445)� , , ELEV.=846.61 j , o v1 ,� IX �I 4 r TO BE REMOVED ��e``` • L i 6 Ol '�' co' a `� ` i L I J 44_ ` �( rY <j' A, i k 8 I Gl V �, �` I * \ I �. ( �j 4G SOUTHERLY CURB LINE 45 i,.' •(� gi rp• a ��� prQ' cb-- 2 PR _pED STALL L �' I I - TILTED AND DOES NOT CARRY 00 --- - , 34 PROPOSED PARKING STALLS _ A� CO AS O $ AS Dx I, ND cb 3E \/`-------_ �O. CURB CUT_1J L-I- �� Y 9 o <b ELEV = 45 4 HSJ BENCHMARK #3 I E % X CUT,� X 9 . - \ / X E CUT Ir TOP o844 9NAIL 8 - -- �G « {� \��i 8� G aA5 SX ��LEVURB 45.4 �� �`� �.�� 1 1 z_ ELEV. 45.4 l o' ` - cA �' ♦ rot � fx �n CURB CUT i �n 11 c� c� - - - Yb � `, 0� ELEV. = 45.4 iN h' g� cN ao - fi- --- 100� RIGHTn1 F WAY ----- --� AN `�5 \ 9 5• - - - - L L D CURB C T DRIv A ��� I �. i CURB CUT 13 PROPOSED PARKING,�STALLS - - 6 - - LL - � O�� / - `� pc�i �� j ELEV. = 45.4 4G �h -11 PROPOSED PARKING STALLS I _ ,_ / - �€LEV. 45. I I ✓ I 5� h1 i °� �5.8 "1 d i -2 1 00 ®PROPOSE PARKIN/ STALLS S) I �O`�•`�/_ 1 I - r581 � /�-/ , -�` - � 6 -` _ _ 0� � ' cD • �j - ram- -i' ao 0� ` ►rF� ` _ __ - i J � txh 0 I 24.00- - - _ - PRQPOSED - GARDEN SEE NOTE N 9 •6 PROPOSED RAIN GARDEN 44 - -- - - OSE0 R7 IN GARDEN SEE NOTE N . I - -- -_ --- -- �, �, ---------------�,----------- --_ _ - I ,.I , � ����� \y - - � - _ ► � ` •� � � '� » � � � � � � � ----- -- �, EXISTING DRIVEWAY TO 8E REMOVED Q X= -� J ✓ S 0'20 23 ED 445. 01 i t, �� O o� �b , ✓ I ��`` CURB LINE AND SIDEWALK TO BE RIGHT OF WAY LINE_ J/ ��` -1p-1� ptx bc�` � t� Cb c� D� L DcG� �GD � Dci ` � Dc �. �, O O '� �8 I REPLACED PER CITY SPECIFICATION OF JAMES AVE $ - _ �� ��• 3 D� � D 1 �5� cb �h �O ---tx�--�o=-- _- SOX-- - -- - tK \`° �� - - - -- - - --� - - - - --- - �X 1 - �- I i.._-X O ` - X --- X-----o� X X �� 1 844 �6G ELEV = 46.46---,\ h i n o - � ---- I ^ /I r ^ - C�- - - - - \- 7-F- - I ,, _I_ r - - 1� O �) ` �; _ - �F_! i �.E W TOP OF INTEGRATED CURB `� ��O i _� _ _ ► ��' °6 1 _ , h lJ/-��V�L_ "D- V L_I VLJL_ I v\-./I \ I rl, _- ��. i ELEV = 46.4 �\ �`.. 9 �� - T - ��- �� �` iaUBLIC RIGHT CF IAIA J I tK D ` - cb { C� 1 FINISHED FLOOR = 46.54 - _ _ -- --T - -- _ - - j �06 / 0.5% MIN. SLOPE - 4' CONC. WALK - CONC. SLAB --- y �. �O -- J- ^ - �� BITUMINOUS SURFACE /� �` ��- �,- ��� v7 �MATCH E �/ a MATCH Jo TAPER TOP OF CURB TO q � MATCH _� �/ EXISTING CURB C) s ENTRY ELEVATION DETAIL EXISTING CUB GUTTER LINE TO ALLOW -' `_MATCH EXISTING CURB 00 I FOR OVERFLOW OF RAIN GARDEN - EXISTING CURB I / D T/C = 845.25 MAX �` 1 NOT TO SCALE I X 1��N ��D r- EXISTING CURB i CURB CUT (iYP.) -T ------------- 8 FEET------------� RAIN GARDEN CROSS SECTION DETAIL NOT TO SCALE `6' SCALE: 9 INCH = 30 FEET REVISIONS I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Registered stered Land d Surveyor under the laws of the SMinnesota z/V z Thomas'E. Hodorff, L.S Minnesota Reg. No. 23677 Date: -� April 19, 2011--- PROPOSED GRADING PLAN For: JT EGNER CONSTRUCTION SITE: 1700 FREEWAY BOULEVARD BROOKLYN CENTER, MINNESOTA HENNEPIN COUNTY HARRY S. JOHNSON CO., INC. W LAND SURVEYORS L- J 9063 Lyndale Avenue South Bloomington, MIN. 55437 Tele. 952-884-5341 Fax 952-884-5344 www.hsjsurveyors.com 617 1-3-6148GRA 49 2011166.01 CT 1 OF 1